New Year Sale 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70track

Free ISTQB ISTQB-CTFL Practice Exam with Questions & Answers | Set: 4

Questions 31

The four test levels used in ISTQB syllabus are:

1. Component (unit) testing

2. Integration testing

3. System testing

4. Acceptance testing

An organization wants to do away with integration testing but otherwise follow V-model. Which of the following statements is correct?

Options:
A.

It is allowed as organizations can decide on men test levels to do depending on the context of the system under test

B.

It is allowed because integration testing is not an important test level arc! can be dispensed with.

C.

It is not allowed because integration testing is a very important test level and ignoring i: means definite poor product quality

D.

It is not allowed as organizations can't change the test levels as these are chosen on the basis of the SDLC (software development life cycle) model

ISTQB ISTQB-CTFL Premium Access
Questions 32

A system has a self-diagnostics module that starts executing after the system is reset. The diagnostics are running 12 different tests on the systems memory hardware. The following is one of the requirements set for the diagnostics module:

'The time taking the diagnostics tests to execute shall be less than 2 seconds' Which of the following is a failure related to the specified requirement?

Options:
A.

The diagnostic tests fail to start after a system reset

B.

The diagnostic tests take too much time to execute

C.

The diagnostic tests that measure the speed of the memory, fail

D.

The diagnostic tests fail due to incorrect implementation of the test code

Questions 33

What role in a formal or technical review should mediate between different opinions to ensure an effective review?

Options:
A.

Scribe (or recorder)

B.

Manager

C.

Moderator (or facilitator)

D.

Reviewer

Questions 34

During which main group of test activity are the following tasks performed?

•Checking test results and logs against specified coverage criteria.

•Assessing the level of component or system quality based on test results and logs.

•Determining whether more tests are needed.

Select the correct answer:

Options:
A.

Test planning.

B.

Test analysis.

C.

Test design.

D.

Test monitoring and control.

Questions 35

A software development company invests heavily in tools to support the entire software development lifecycle, including testing. They have a tool that allows automated creation and installation of builds and subsequent execution of various types of automated tests. Which ONE of the following is a CORRECT statement about this type of test tool?

Options:
A.

It is an example of collaboration tool

B.

It is an example of test implementation tool

C.

It is an example of DevOps related tools

D.

It is an example of automated unit testing tool

Questions 36

In the newest version of payroll system number of changes were made. As a tester you got a task to perform regression and confirmation tests. Which of the following project activities are related to confirmation testing?

Options:
A.

Testing due to the application of a new version of the interface

B.

Testing that fixes resolved the defects in the search function

C.

Testing if a system still works after update of an operating system

D.

Testing to ensure the adding of a new functionalities haven't broken existing functions

Questions 37

Which of the following BEST matches the descriptions with the different categories of test techniques?

1.Test cases are based on the test basis which may include the requirements, use cases and user stories

2.Test cases are based on the test basis which may include the software architecture or code

3.Test cases can show deviations from the requirements

4.These test techniques are applicable to both functional and non-functional testing

5.Tests are based on knowledge of developers, users and other stakeholders

Black - Black-box test techniques

White * White-box test techniques

Experience - Experience-based test techniques

Options:
A.

Black -1,3.4 White - 2 Experience - 5

B.

Black - 2, 3 White -1 Experience - 4, 5

C.

Black -1,2 White - 3, 4 Experience - 5

D.

Black - 2, 3 White -1,5 Experience - 4

Questions 38

Which are the MAIN goals of risk management in a software project?

Options:
A.

To increase the success probability for the project regardless of costs.

B.

To increase focus on preventative processes and to increase satisfaction for the testers.

C.

To control contractual problems and minimize the impacts of company policies.

D.

To reduce the probability of undesired situations and to reduce the effect of potential impact.

Questions 39

Which type of software development product can undergo static testing?

Options:
A.

Any software development product can undergo static testing, including requirements specifications, design specifications and code.

B.

Static tests should be performed on the installation and user guide documents as these documents are used by the end user.

C.

Static testing is done only on the code as part of the "code review" sessions Other documents are reviewed, but not by static testing.

D.

Static testing is done only on the requirements You need to execute the software in order to find defects in the code.

Questions 40

The statement: "Test activities should start in the early stages of the lifecycle, adhering to the testing principle of early testing” is relevant to which of the recognized software development models?

Options:
A.

Sequential development model.

B.

Iterative development model.

C.

Incremental development model.

D.

All the above