Questions 31

If a shipment has a gross weight of 500 pounds and overall dimensions of 42 inches x 48 inches x 48 inches, what is the density of the shipment (in pounds per cubic foot)?

Options:
A.

0.744

B.

0.005

C.

8.9

D.

5.0

ISM INTE Premium Access
Questions 32

To ensure items frequently employed in production are immediately available for Kanban replenishment, a storage location is established specifically for these items. This inventory location is known as a(n)

Options:
A.

overflow location

B.

random location

C.

point-of-use location

D.

fixed location

Questions 33

Which of the following is the BEST reason to use Monte Carlo simu-lations to improve a forecast7

Options:
A.

To create a forecast that is accurate but has a wider distribution of potential outcomes

B.

To provide a single correct forecast that removes uncertainty

C.

To increase confidence in the forecast by reducing uncertainty

D.

To simulate potential outcomes and accept the resulting forecast without question

Questions 34

A firm has created the following process flow diagrams depicting two possible strategies for the production of a new product line. The triangles represent inventory, and the rectangles represent processing. Each of the two options start with the same raw materials, and both create the product through two stages of processing.

INTE Question 34

Which of the following statements is correct?

Options:
A.

Option B's customers are likely to wait longer before receiving the product.

B.

Option A's product will be equally as expensive to make as Option B's.

C.

Option A's product is customizable for customers.

D.

Option B's product is an example of delayed differentiation.

Questions 35

Material accumulated for a well-defined future need is called

Options:
A.

buffer stock

B.

continuous inventory

C.

anticipation inventory

D.

safety stock

Questions 36

Which of the following is calculated by taking the selling price of the buyer's end product and subtracting the required profit?

Options:
A.

Total cost

B.

Target cost

C.

Allowable cost

D.

Should cost

Questions 37

BCD Manufacturing's products have very high velocity. Accordingly, the firm is redesigning its warehouse to accommodate additionalimplement a system that

will allow its products to be stored in flexible locations, due to the high demand of different SKUs. This strategy should also allow the orgfeization to improve warehouse efficiency. In this situation, which of the following types of storage strategies should BCD employ?

Options:
A.

Overflow locations

B.

Fixed item locations

C.

Floating locations

D.

Point-of-use locations

Questions 38

Which of the following is MOST likely to be an advantage of a standardization program?

Options:
A.

Improved supplier flexibility

B.

Reliance on fewer suppliers

C.

Creation of new supplier relationships

D.

Consistent quality

Questions 39

Over the past 90 days, a buying company's manufacturing engineers have reported an increase in the number of defective parts received from a key supplier. The engineers report that there are three different types of defects occurring, and that they are all being discovered during production. The supplier states that it does not have enough resources to assess the root cause of the three types of defects all at one time. Which of the following should the buying firm do in this instance?

Options:
A.

Work with engineering to determine the impact each defect type has on the customer base and assist the supplier in prioritizing and solving the defect type with the highest customer impact first

B.

Calculate the number of times each of the defect types have occurred over the past 90 days, and instruct the supplier to work on finding the root cause of the defect with the highest frequency

C.

Calculate the number of times each of the defect types have occurred over the past two weeks, and instruct the supplier to work on finding the root cause of the defect with the highest frequency

D.

Work with engineering to submit three corrective action requests and ask the supplier to address all three

Questions 40

A supply manager is analyzing potential costs associated with the raw materials needed for a new product launch. Tooling costs are known, but the range of forecasts for future sales—and therefore demand for materials-varies widely. Given these circumstances, the supply manager should consider using which of the following?

Options:
A.

Data mining

B.

Decision tree

C.

Analysis of variance

D.

Critical path

Exam Code: INTE
Certification Provider: ISM
Exam Name: Supply Management Integration
Last Update: Jul 11, 2025
Questions: 167

ISM Related Exams

How to pass ISM CORE - Supply Management Core Exam Exam
How to pass ISM LEAD - Leadership and Transformation in Supply Management Exam

ISM Free Exams

ISM Free Exams
Examstrack offers free ISM exam materials and practice tests to aid your ISM certification journey.