Month End Sale - 75% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: magic75

Free International Code Council 93-Tall-Mass-Timber-Buildings Practice Exam with Questions & Answers | Set: 2

Questions 11

In mass timber construction of Type IV-C, the fire-resistance ratings of bearing walls are permitted to be reduced by _____ where supporting a roof only.

Options:
A.

30-minutes

B.

45-minutes

C.

1-hour

D.

2-hours

International Code Council 93-Tall-Mass-Timber-Buildings Premium Access
Questions 12

Refer to the exhibit by clicking on the EXHIBIT button above.

93-Tall-Mass-Timber-Buildings Question 12

In the detail shown, what is the required tolerance in inches between the steel beam web and CLT?

Options:
A.

3/16

B.

1/2

C.

2

D.

3

Questions 13

Which of the following best describes the required protection for mass timber hoistway enclosure walls in Type IV-C construction?

Options:
A.

Noncombustible protection of at least 40 minutes fire resistance

B.

No requirement, but walls must achieve the required fire-resistance rating

C.

Noncombustible protection of at least 1/2 in. gypsum board or equivalent

D.

fire-retardant-treated-wood sheathing, 1/2-inch gypsum board, or a noncombustible material

Questions 14

In Type IV-C construction, a connection between two members of the primary structural frame supporting a floor is required to be protected to achieve a minimum fire-resistance rating of:

Options:
A.

1 hour

B.

1-1/2 hours

C.

2 hours

D.

3 hours

Questions 15

For a sprinklered Business Occupancy (Group B) in a 15-story building of Type IV-A construction, the maximum allowable building area is:

Options:
A.

54,000 sq. ft.

B.

648,000 sq. ft.

C.

972,000 sq. ft.

D.

unlimited.

Questions 16

Adhesives used to resist passage of air in construction Type IV-C, shall be in accordance with which of the following standards?

Options:
A.

UL 263

B.

ASTM A653

C.

ASTM D3498

D.

ASTM F1575

Questions 17

The building owner shall be responsible for each of the following for fire safety during construction except:

Options:
A.

completion of a daily fire safety inspection at the project site by the site safety director.

B.

documentation and maintenance on-site of each inspection’s results until a certificate of occupancy has been issued.

C.

securing documentation in a fire- and water-resistant safe until a certificate of occupancy has been issued.

D.

making documentation immediately available on-site for presentation to the fire code official upon request.

Questions 18

The maximum allowable height for a Group I-4 building of Type IV-B construction provided with an automatic sprinkler system in accordance with Section 903.3.1.1 is _____ ft.

Options:
A.

60

B.

120

C.

180

D.

270

Questions 19

One code-recognized method for calculating the fire-resistance rating of exposed wood members and decking is:

Options:
A.

ACI 216.1

B.

TMS 0216

C.

ASCE 29 Chapter 5

D.

AWS NDS Chapter 16

Questions 20

Materials acceptable for use in fire-protecting connections in Type IV-A construction includes each of the following except:

Options:
A.

steel plates.

B.

gypsum board.

C.

a coating approved for the required fire endurance time.

D.

additional wood cover applied over the connection.