In an office building where all of the occupants are under the age of 65 years, which of the following illuminance levels meets the requirements for the office area?
Which of the following ergonomic design strategies would a project team implement to achieve Part 1: Support Visual Ergonomics of Feature V02: Ergonomic Workstation Design?
To contribute to Feature A11: Source Separation, which of the following rooms is most likely to require exhaust fans such that the return air is vented outdoors and not recirculated?
In addition to M06: Restorative Opportunities, which feature contributes to a healthy sleep and wake rhythm?
Sick building syndrome is caused by the buildup of indoor pollutants which is linked to which of the following?
Please click on the Project Scenario B button to review the project scenario and answer the following question.
BAY TOWERS BY BAYLEAF - SEATTLE, UNITED STATES - PROJECT SCENARIO B. Bay Towers by Bayleaf is a 20-floor commercial building overlooking Elliot Bay in Seattle, United States.
The building enjoys abundant natural light through floor to ceiling windows which take in Elliot Bay city views. Although located behind a major highway (four-lanes of traffic), there is a pedestrian bridge which connects their ground floor reception to the riverfront park on the other side of the highway.
The building is owned and operated by Bayleaf Inc., a real-estate organization. The building is leased at a 70% occupancy rate by a range of tenants, including those in finance, technology and healthcare. The total expected occupancy of the building is 1,000 people.
Bay Towers is mechanically ventilated and currently has MERV 11 filters. As the building owner, Bayleaf provides HVAC fit-out for tenant spaces, but tenants complete the interior walls and supply the finishes and furniture themselves. While no food is provided by Bayleaf, some individual tenants do have pantries where they provide their own snacks and beverages for their own employees.
Bayleaf manages the building and operates the ground floor which includes the reception, building management office, meeting rooms, as well as the elevator banks on each floor and the rooftop. Meeting rooms are common amenities that are able to be booked by the tenants. Bayleaf has two employees that work at desks onsite, a receptionist at the front desk and a property manager in the building management office.
PROJECT SCOPE & GOALS
Bayleaf has enrolled Bay Towers for WELL Core Certification to attract and retain high-quality tenants and address growing tenant demand for well-being facilities.
As part of the WELL Core Certification scope, Bayleaf intends to renovate their ground floor and are open to leveraging some of this space to include health and well-being programming.
The scope of renovation will also include upgrades to the base building, such as staircases, end-of-trip facilities and the air filtration system. The rooftop will also be converted into a public green space for tenants to use for recreation. Tables, chairs and barbeque facilities will be added, as well as several gardens, including edible plots and lawn areas.
Bayleaf is hoping their WELL Core Certification will provide some initial feature compliance for tenants wishing to also pursue WELL Certification for their spaces.
By installing digital displays that promote the consumption of fruits, vegetables and water in the dedicated eating areas, which of the following features could the project team attempt?
For projects to obtain WELL Certification at the Platinum level, what is the minimum number of points that must be achieved per concept?
A shopping center wants to comply with W08: Hygiene Support in family bathrooms. Which of the following is a strategy to achieve this feature?
For an office building with 1,500 regular occupants and 500 occasional visitors per day, which of the following facilities meets the requirements established in Feature V04: Facilities for Active Occupants?
An Environment, Health and Safety (EHS) manager finds that the air quality at an indoor construction site is degrading because the contractors are demolishing wooden boards. Which step should the manager take first to address this problem?
PDF + Testing Engine
|
---|
$66 |
Testing Engine
|
---|
$50 |
PDF (Q&A)
|
---|
$42 |
WELL Free Exams |
---|
![]() |