Summer Special 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bestdeal

Free VMware 2V0-13.24 Practice Exam with Questions & Answers | Set: 3

Questions 21

An architect is designing a VMware Cloud Foundation (VCF)-based solution for a customer with the following requirement:

The solution must not have any single points of failure.

To meet this requirement, the architect has decided to incorporate physical NIC teaming for all vSphere host servers. When documenting this design decision, which consideration should the architect make?

Options:
A.

Embedded NICs should be avoided for NIC teaming.

B.

Only 10GbE NICs should be utilized for NIC teaming.

C.

Each NIC team must comprise NICs from the same physical NIC card.

D.

Each NIC team must comprise NICs from different physical NIC cards.

VMware 2V0-13.24 Premium Access
Questions 22

An Architect is responsible for designing a VMware Cloud Foundation (VCF)-based solution for a customer. During the discovery workshop, the following requirements were stated by the customer:

All applications/workloads designated as business critical have a Recovery Point Objective (RPO) of 1 business hour.

The infrastructure components of the VCF solution must have a Recovery Time Objective (RTO) of 4 business hours.

In the context provided, what does the RTO measure?

Options:
A.

It determines the minimum amount of data loss that can be tolerated.

B.

It determines the maximum tolerable amount of time allowed before an application/service should be recovered to a usable state.

C.

It determines the minimum tolerable amount of time allowed before an application/service should be recovered to a usable state.

D.

It determines the maximum amount of data loss that can be tolerated.

Questions 23

During a requirement capture workshop, the customer expressed a plan to use Aria Operations Continuous Availability. The customer identified two datacenters that meet the network requirements to support Continuous Availability; however, they are unsure which of the following datacenters would be suitable for the Witness Node.

2V0-13.24 Question 23

Which datacenter meets the minimum network requirements for the Witness Node?

Options:
A.

Datacenter A

B.

Datacenter B

C.

Datacenter C

D.

Datacenter D

Questions 24

Which Operating System (OS) is not supported by Aria Operations for OS and Application Monitoring?

Options:
A.

Windows Server 2012 R2

B.

CentOS

C.

Windows Server 2012

D.

MacOS

Questions 25

A customer is deploying VCF at a new datacenter location. They will migrate their workloads from the existing datacenter to the new VCF platform over six months. Both datacenters will run simultaneously for six months during the migration. Which of the following should be a documented risk?

Options:
A.

Six months may not be enough time to complete the migration.

B.

There will be connectivity between the two locations.

C.

Bandwidth between the two locations is sufficient to accommodate the workload migration.

D.

Workloads will be powered off during migration.

Questions 26

An architect is responsible for updating the design of a VMware Cloud Foundation solution for a pharmaceuticals customer to include the creation of a new cluster that will be used for a new research project. The applications that will be deployed as part of the new project will include a number of applications that are latency-sensitive. The customer has recently completed a right-sizing exercise using VMware Aria Operations that has resulted in a number of ESXi hosts becoming available for use. There is no additional budget for purchasing hardware. Each ESXi host is configured with:

2 CPU sockets (each with 10 cores)

512 GB RAM divided evenly between sockets

The architect has made the following design decisions with regard to the logical workload design:

The maximum supported number of vCPUs per virtual machine size will be 10.

The maximum supported amount of RAM (GB) per virtual machine will be 256.

What should the architect record as the justification for these decisions in the design document?

Options:
A.

The maximum resource configuration will ensure efficient use of RAM by sharing memory pages between virtual machines.

B.

The maximum resource configuration will ensure the virtual machines will cross NUMA node boundaries.

C.

The maximum resource configuration will ensure the virtual machines will adhere to a single NUMA node boundary.

D.

The maximum resource configuration will ensure each virtual machine will exclusively consume a whole CPU socket.

Questions 27

An administrator is documenting the design for a new VMware Cloud Foundation (VCF) solution. During discovery workshops with the customer, the following information was shared with the architect:

All users and administrators of the solution will need to be authenticated using accounts in the corporate directory service.

The solution will need to be deployed across two geographically separate locations and run in an Active/Standby configuration where supported.

The management applications deployed as part of the solution will need to be recovered to the standby location in the event of a disaster.

All management applications will need to be deployed into a management tooling zone of the network, which is separated from the corporate network zone by multiple firewalls.

The corporate directory service is deployed in the corporate zone.

There is an internal organization policy that requires each application instance (management or end user) to detail the ports that access is required on through the firewall separately.

Firewall rule requests are processed manually one application instance at a time and typically take a minimum of 8 weeks to complete.

The customer also informed the architect that the new solution needs to be deployed and ready to start the organization’s acceptance into service process within 3 months, as it is a dependency in the deployment of a business-critical application. When considering the design for the Cloud Automationand Operations products within the VCF solution, which three design decisions should the architect include based on this information? (Choose three.)

Options:
A.

The Cloud Automation and Operations products will be reconfigured to integrate with the Identity Broker solution instance at the standby site in case of a Disaster Recovery incident.

B.

The Identity Broker solution will be deployed at both the primary and standby site.

C.

The Identity Broker solution will be connected with the corporate directory service for user authentication.

D.

The Identity Broker solution will be deployed at the primary site and failed over to the standby site in case of a disaster.

E.

The Cloud Automation and Operations products will be integrated with a single instance of an Identity Broker solution at the primary site.

F.

The Cloud Automation and Operations products will be integrated directly with the corporate directory service.