Questions 1

A multi-level shopping centre is open every day to the public from 09:00–21:00 hours. During an external audit of the centre to ISO 14001, you establish that there are 40 vending machines that are permanently switched on. Thirty of them do not sell perishable foodstuffs. You also note that there are eight escalators in the complex that run constantly during public access. When asked about environmental performance improvement objectives, the Centre Manager says that there are plans to increase the natural daylight by installing more skylights thus saving on lighting costs, but the estimated budget for this has not yet been approved by the board.

You: I note that energy consumption is a significant environmental aspect in the centre. How do you mitigate the impacts of this?

EMS Manager: We try to reduce our energy costs by negotiating a better deal from the energy company. We are considering changing to one that only supplies electricity from renewable sources.

You: What steps have you taken to reduce overall consumption?

EMS Manager: We conducted awareness training for staff. For example, turning off lights in staff areas not being used.

You: I see that the escalators account for the highest usage of energy. Are there any objectives to try and reduce this?

EMS Manager: No, it would be too costly to change them.

You: How do you measure electricity consumption?

EMS Manager: We have meters installed in each floor of the centre. We take readings every hour and we plot the consumption graph for every staff shift.

You continue the interview and find that energy consumption has increased steadily over the past five years. Select the two statements that are true.

Options:
A.

The centre staff are responsible for energy consumption in the staff areas.

B.

The vending machines are switched on permanently.

C.

The Centre Manager is trained in energy awareness.

D.

The organisation ' s energy supplier sources renewable energy.

E.

The escalators are switched on permanently.

F.

The organisation should take action to address its energy consumption.

Questions 2

Which two of the following do not participate in a second-party audit to ISO 14001?

Options:
A.

An auditor employed by an external consultancy organisation

B.

An auditor certified by an auditor certification body

C.

An auditor from a customer

D.

A certification body auditor

E.

An auditor trained in the CQI and IRCA scheme

F.

An auditor from an accreditation body

Questions 3

An oil organisation has a natural gas treatment plant on land crossed by several small rivers. On one particular day, after heavy rainfall for 48 hours, some of those rivers burst their banks and flooded the water treatment facilities of the plant. The oil-contaminated water reached some scarcely populated areas nearby.

Soon after, an internal audit was carried out to particularly analyse this event that was considered a nonconformity. There were no records of such heavy rainfall in the past 200 years.

Which three of the following actions are ' corrections ' ?

Options:
A.

Offer loans to the persons affected to build new houses far from the plant

B.

Revise the existing emergency plan

C.

Clean up the houses of the persons affected

D.

Clean up the affected land

E.

Build up some additional protection to the water treatment plant

F.

Relocate the water treatment plant to lower ground

G.

Reinforce the riverbanks with cement

Questions 4

An organisation (ABC) plans to carry out a second-party audit of the environmental management system of a supplier (XYZ). Both, ABC and XYZ, have a certified Environmental Management System (EMS) to ISO 14001 by the same certification body.

Which one of these statements is correct?

Options:
A.

ABC should not ask permission from the certification body to carry out the audit to XYZ.

B.

ABC should request to see a copy of the last certification body audit report from XYZ.

C.

ABC should invite, as an observer, an auditor of the certification body when it carries out the audit to XYZ.

D.

ABC should inform the certification body that it is planning to audit XYZ.

Questions 5

An audit team leader arrives at a steel fabrication organisation that manufactures fire escape stairs to carry out a Stage 2 certification audit. At a meeting with the EMS Manager, she is informed that they have secured their largest contract from a construction organisation to manufacture and install fire escape stairs. They appointed a subcontractor to perform the installation work. The EMS Manager wants the ISO 14001 audit extended to cover the installation site.

During the audit, a team member found that several complaints had been made to the organisation regarding their installation operators being seen to dispose of excess paint into the site drains, which breached legal requirements. The EMS Manager blames the contractors they had to take on because of the big contract. The auditor raises a nonconformance against clause 8.1 of ISO 14001.

Which one of the following statements would support this finding?

Options:
A.

There was no statement in the installation contract of the need for the subcontractor to comply with the EMS policy.

B.

There was no record that the operators were aware of the environmental risks associated with their work.

C.

The organisation did not provide the correct resources to prevent the environmental incidents from taking place.

D.

The organisation failed to check the competence of the operators to perform work in an environmentally friendly way.

Questions 6

A group of 22 Italian restaurants in downtown San Francisco (US) established an EMS following the requirements of ISO 14001. You are performing an internal audit before the fourth certification cycle. The audit plan included an audit of the General Manager (GM) as the last interview before the closing meeting. During the interview with the GM, you audit clause 10.3 (Continual improvement). The dialogue is as follows.

You: Could you please tell me how did you improve the EMS to enhance environmental performance (Clause 10.3)?

GM: One way to improve the EMS is to improve one or several of its processes. We decided to improve the water-consuming processes in all our branches. We use water in many of our processes (e.g. to wash our kitchens, our cutlery, plates, and glasses, to keep our floors clean). The idea was to review these processes in detail to reduce the amount of water used per customer. Each of the 22 branches sent us their results, we analysed the data and found out that the average water consumption per customer was reduced by 13%; therefore, we improved our environmental performance. We are happy about that.

You: What about the results in each branch?

GM: Have a look at this table:

ISO-14001-Lead-Auditor Question 6

Analysing this table, what would be your decision related to raising nonconformities to clause 10.3? Select two.

Options:
A.

I would raise a nonconformity for branches in D

B.

I would raise a nonconformity for branches in C and D

C.

I would raise an opportunity for improvement for branches in B, C, and D

D.

I would raise a nonconformity for the whole group

E.

I would raise a nonconformity for branches in B

F.

I would not raise any nonconformity

Questions 7

You are responsible for the second surveillance audit of ABC, a medium-sized metal mechanical manufacturing organisation. The significant environmental aspects are loud noise, solid waste, energy consumption and liquid waste.

During the opening meeting, you are informed that when COVID-19 started, sales increased considerably, so they had to open a third shift, from 10 pm to 6 am. You interview the Production Manager.

You: How did you carry out this change and how did you evaluate the impact on ABC’s EMS?

PM: It was very simple, we just did it.

You: Did you introduce any change in the EMS?

PM: No. It is the same processes, the same products, the same materials, therefore the same environmental aspects.

You: What about the people?

PM: We distributed the most experienced workers among the three shifts. They trained the newly hired personnel.

Which of the six key questions from the following list would you ask? Have you...

Options:
A.

revised the internal audit programme?

B.

reviewed the environmental objectives?

C.

reviewed the infrastructure maintenance plan?

D.

evaluated the extra amount of waste that will be generated?

E.

developed any formal documented plan to change the EMS?

F.

reviewed the needs and expectations of interested parties?

G.

reviewed the authorities and responsibilities of all roles?

Questions 8

Which one of the following conclusions in the audit report is not required by the certification body when deciding to grant certification?

Options:
A.

The plans to address corrective actions related to minor nonconformities have been accepted.

B.

The scope of certification has been fulfilled.

C.

The corrections taken by the organisation related to major nonconformities have been accepted.

D.

The organisation fully complies with all legal and other requirements applicable to the Environmental Management System.

Questions 9

Wash-it-up is an organisation that provides window cleaning services for the industrial sector. It has been certified to ISO 14001 for some time and has appointed a new EMS Manager. The audit plan during a surveillance audit includes the improvement actions and the auditor asks to see the most recent management review meeting minutes.

Which two statements would represent an input to the management review process?

Options:
A.

Allocation of a bigger budget for the EMS department

B.

Changes in EMS leadership

C.

Decision to purchase new spillage kits for operators

D.

Report of performance of EMS objectives in the last year

E.

Improvement in the organisation’s profitability

F.

Minutes of previous management reviews

Questions 10

A huge public library established an EMS following the requirements of ISO 14001, which was third-party certified 10 years ago. You are performing the second surveillance audit of the third certification cycle. The audit plan included an audit to the Director as the last interview before the closing meeting.

During the interview with the Director, you audit clause 6.2 (Objectives and planning to achieve them). The dialogue is as follows:

You: Could you please tell me which were the environmental objectives defined for last year and show evidence of their achievement?

Director: Yes. We had defined three objectives. As you can see from our Annual Plan, one of them was to separate our waste in four categories: paper, plastics, metals, food — before, we had only three (plastic and paper were disposed together). We developed an Action Plan to achieve this objective.

Which six of the questions would you ask related to the Action Plan?

Options:
A.

Did you define any method for monitoring progress?

B.

Was it approved by the Director?

C.

Who was responsible for the completion of the plan?

D.

Did you estimate what resources would you need?

E.

Is it consistent with the environmental policy?

F.

How was progress of the plan being monitored?

G.

How did you measure it?

Certification Provider: PECB
Exam Name: PECB Certified EMS ISO 14001 Lead Auditor Exam
Last Update: Jul 14, 2026
Questions: 66
PDF + Testing Engine
$164.99
$49.5
Testing Engine
$124.99
$37.5
PDF (Q&A)
$104.99
$31.5