How many data-serving SVMs are supported with Cloud Volumes ONTAP that is running ONTAP 9.5?
A disaster causes a FlexGroup volume to be unrecoverable, but it was protected by a SnapMirror relationship. You solve the issue, and the source is operational. Now, you want to return to serving the data from the original source.
In this scenario, what do you do next?
Which CIFS server configuration determines the domain controllers that a CIFS server uses?
The details from within Active IQ Cluster Viewer are downloadable in which three file formats? (Choose three.)
A volume was accidentally deleted two hours ago by another administrator. No backups exist.
In this scenario, what do you do to restore the data?
You need to provide a customer an action plan to update an ONTAP system after a security bulletin has been issued.
In this scenario, how do you accomplish this task?
What are two conditions that would cause writes in memory to be written to disk? (Choose two.)
In ONTAP 9.5, the event log show command queries and displays entries from which file?
After a network card was replaced in an ONTAP node, you see the output shown in the exhibit.

What is the problem?
Your customer's MetroCluster has generated a "DISK REDUNDANCY FAILED" message.
Netapp-EmA:
Tue Jan 14 04:12:12 CET [netapp-EmA:cf.rv.notConnected:error]: HA interconnect: Connection for 'cfo_rv' failed.
Tue Jan 14 04:12:13 CET [netapp-EmA:rv.connection.torndown:info]: HA interconnect: cfo_rv1 is torn down on NIC 1.
Tue Jan 14 04:12:13 CET [netapp-EmA:cf.rv.notConnected:error]: HA interconnect: Connection for 'cfo_rv'1 failed.
Tue Jan 14 04:12:15 CET [netapp-EmA:rv.connection.torndown:info]: HA interconnect: cfo_rv2 is torn down on NIC 1.
Tue Jan 14 04:12:18 CET [netapp-EmA:cf.rv.notConnected:error]: HA interconnect: Connection for 'cfo_rv'2 failed.
Tue Jan 14 04:12:19 CET [netapp-EmA:bridge.removed:info]: FC-to_SAS bridge siteB_2:13.126L0 [ATTO FibreBridge6500N 1.61] S/N [FB7500N111161] was removed
Tue Jan 14 04:12:19 CET [netapp-EmA:bridge.removed:info]: FC-to_SAS bridge siteB_2:5.126L0 [ATTO FibreBridge6500N 1.61] S/N [FB7500N111160] was removed
Netapp-EmB:
Tue Jan 14 04:12:12 CET [netapp-EmB:cf.rv.notConnected:error]: HA interconnect: Connection for 'cfo_rv' failed.
Tue Jan 14 04:12:12 CET [netapp-EmB:rv.connection.torndown:info]: HA interconnect: cfo_rv2 is torn down on NIC 1.
Tue Jan 14 04:12:13 CET [netapp-EmB:rv.connection.torndown:info]: HA interconnect: cfo_rv1 is torn down on NIC 1.
Tue Jan 14 04:12:13 CET [netapp-EmB:cf.rv.notConnected:error]: HA interconnect: Connection for 'cfo_rv'1 failed.
Tue Jan 14 04:12:18 CET [netapp-EmB:cf.rv.notConnected:error]: HA interconnect: Connection for 'cfo_rv'2 failed.
Tue Jan 14 04:12:19 CET [netapp-EmB:bridge.removed:info]: FC-to_SAS bridge siteA_2:13.126L0 [ATTO FibreBridge6500N 1.61] S/N [FB7500N111167] was removed
Tue Jan 14 04:12:19 CET [netapp-EmB:bridge.removed:info]: FC-to_SAS bridge siteA_2:5.126L0 [ATTO FibreBridge6500N 1.61] S/N [FB7500N111164] was removed
Referring to the messages shown in the exhibit for each node, which component is causing the problem?
|
PDF + Testing Engine
|
|---|
|
$49.5 |
|
Testing Engine
|
|---|
|
$37.5 |
|
PDF (Q&A)
|
|---|
|
$31.5 |
Netapp Free Exams |
|---|
|