You need to set up the system to calculate the overhead rates automatically for production.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
You need to set up the metal production route and BOM.
Which three actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
You need to configure each item for plastic manufacturing.
Which production types should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
A company produces generic and name-brand paper plates in the same factory using standard costing and unrig the same Bill of materials and routes to produce both product.
The finance and production teams want a way to new individual raw material consumption costs in the ledger.
You need to add a production group to tie finished good to control postings to the ledger. What should you do?
A company is implementing Dynamics 365 Supply Chain Management The company is a subcontractor that produces subassemblies for two major customers. CustomerA and Customers
The company prioritizes CustomerA production orders to start on Mondays. The production orders may take several days to complete. Customers’ orders are produced throughout the week, after CustomerA orders are completed. Work in process (W1P) must be calculated and consolidated for CustomerA and CustomerB respectively on the financial reports.
You need to configure the production requirements.
What should you configure? To answer, drag the appropriate configurations to the correct requirements. Each configuration may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
A manufacturing company is implementing production in Dynamics 365 Supply Chain Management.
The production scheduler requires that machines not be scheduled to run concurrently when planning production. The scheduler also must be able to see the scheduling in a graphical view.
You need to configure the system to meet the requirements.
Which three options should you configure? Each answer presents a partial solution.
NOTE: Each correct selection is worth one point.
You are a manufacturing consultant helping a client test out different bill of material (BOM) and route consumption options when starting production orders. Material and labor consumption are to be completed before Report as finish.
You are running a production order with BOM lines that have a Flushing principle set to Start. The Automatic Route Consumption Runtime has been set to Yes.
You have set up the default Start user options for all production orders as shown in the exhibit below.
You are the quality assurance manager of a pharmaceuticals company.
One of your customers has requested to only receive batches of item B0001 that have an acid concentration between 5.5 - 10.5 percent.
You need to set up the customer specific batch attribute to track percent acid for B0001.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
You are the production supervisor at a chemical processing plant.
You must track attributes for each batch of chemicals. Automated quality orders must be generated when a batch order for these chemicals is reported as finished.
You need to ensure that the values of attributes are updated and tracked.
What three actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
A company has a Dynamics 365 Supply Chain Management implementation. The company plans a promotional sales campaign that targets top customers.
The sales campaign will guarantee that orders are delivered within a specific two-week period.
The system configuration must prioritize a group of similar production orders so they can be scheduled at the same time.
You need to configure the system.
What should you create?