Your team has been assigned to lest a new product thatis tightly integrated with existing systems The integrations include data transfers and transformations You have access to the architectural design documents and the integration specifications and some of your testers are former developers.
Given this information, what is the most appropriate test approach?
Your defect opened trend is converging to the closed trend but there is still a gap. What does that gap represent?
You are working for an outsource testing company You have a client that will only consider candidates that are highly skilled with Salesforce. regardless of the number of years they have spent testing similar products You have looked through your skills matrix and you have no one with the right type of experience for this project.
What competence area is your team lacking?
You have assembled the following cost of quality numbers 1 000 defects were found prior to release and 100 were found after.
Given this information what should you conclude?
Which of the following Is considered a heavyweight risk-based testing technique'
You are managing the test team that is testing a new mobile application that provides a "step-by-step' hiking guide Your risk assessment resulted in the following table:
Your team has clone the depth and breadth testing for the GPS accuracy and usability features but when the product was given to beta testers there were some issues Despite the users reporting the app was easy to use at least one user walked off the edge of a cliffand another one ended up in a river.Your team has confirmed that the functionality is working correctly. and the GPS information is accurate.
What other area of testing should you now prioritize?
Your team has been working on anAgile project for two months.There is a retrospective at the end of each sprint One of the data items reviewed is how many defects are being caught by users rather than bytesters.The test team is being blamed for these escapes
What do you need to do to make these sessions more productive?
In an Agile project, when Is it acceptable lo not write a formal defect report when a defect is found''
What is the purpose of lest control?
You have been looking at the actual vs expected defects in one high risk area of the software The actual is much higher than the expected value What should you do?
PDF + Testing Engine
|
---|
$66 |
Testing Engine
|
---|
$50 |
PDF (Q&A)
|
---|
$42 |
ISTQB Free Exams |
---|
![]() |