A TAS that performs automated testing in a single test environment was successfully manually installed and configured from a central repository, with all its components in the correct versions. It was also verified that all TAS components in this environment are capable of providing reliable and repeatable performance. The TAS will be used to run several suites of automated regression test scripts on various SUTs in the test environment. Your current goal is to complete all preliminary verifications to ensure that the TAS works correctly. Which of the following activities would you perform FIRST?
You are currently conducting a Proof of Concept (PoC) aimed at selecting a tool that will be used for the development of a TAS. This TAS will exclusively be used by one team within your organization to implement automated UI-level test scripts for two web apps. The two tools selected for the PoC use JavaScript/TypeScript to implement the automated test scripts and offer capture and playback capabilities. Three test cases for each of the two web apps were selected to be automated during the PoC. The PoC will compare these two tools in terms of their effectiveness in recognizing and interacting with UI widgets exercised by the test cases, to quickly determine whether test automation is possible and which tool is better. Which of the following TAFs is BEST suited for conducting the PoC?
You are a TAE responsible for a TAS that is used on several products, all of which have complex UIs. It has been decided that all radio buttons in one of the products will be changed to checkboxes; checkboxes have not been used in the UI before.
You are updating the TAS to align with this change. Which TWO actions would be MOST appropriate?
a) Write a function to handle checkboxes and add it to the function library
b) Amend the function that handles radio buttons to also handle checkboxes
c) Update the Test Automation Architecture
d) Identify all test scripts that will be affected by the change
e) Amend the library naming conventions to accommodate the change
When a continuous integration/continuous deployment (CI/CD) pipeline is split between build and deployment phases, which statements are TRUE?
a) Component and component integration tests are part of the deployment phase.
b) System and higher-level tests may be part of the build phase.
c) Component and component integration tests are part of the build phase.
d) System and acceptance tests may be executed in a separate pipeline.
e) System integration tests cannot be run in this kind of pipeline.
Consider a TAS implemented to perform automated testing on native mobile apps at the UI level, where the TAF implements a client-server architecture. The client runs on-premise and allows creation of automated test scripts using TAF libraries to recognize and interact with the app’s UI objects. The server runs in the cloud as part of a PaaS service, receiving commands from the client, translating them into actions for the mobile device, and sending the results to the client. The cloud platform hosts several mobile devices dedicated for use by this TAS. The device on which to run test scripts/test suites is specified at run time. You are currently verifying whether the test automation environment and all other TAS/TAF components work correctly. Which of the following activities would you perform to achieve your goal?
When is automated API testing BEST performed?
A new TAS allows the implementation of automated data-driven test scripts. All the tasks planned for the initial deployment of this TAS, aimed at installing and configuring the TAS components and provisioning the infrastructure, will be performed manually by a dedicated, specialized team. This TAS is expected to be deployed in the future in other similar environments. As a TAE, you see a risk that the correct and reproducible deployment of the TAS cannot be guaranteed. Which of the following options is BEST suited for mitigating this risk?
Which items should be included in a report that is produced after execution of a test suite?
You are working as a TAE for a large insurance company that offers a wide range of products, including home, health, and motor insurance. Your next project will be a major change to the existing system for processing policy claims. The project’s objective is to provide more flexibility in the process for claim authorization, according to the type of policy and nature of the claim, so that simple claims can be processed faster. It will follow a hybrid methodology with development and testing completed in 3-week iterations.
The most important functional and non-functional tests for the existing system have been automated. The older tests feature structured scripting, but the more recent ones have benefited from data-driven testing.
Which automation approach for the system-level tests would be MOST suitable for this project?
(Which of the following statements refers to a typical advantage of test automation?)
|