Which of the following statements are true about the industry trend of the data center cooling systems?
On the ECC800-Pro WebUI, the PUE configuration mode can be "Standard" or "User-defined".
After the unit is powered on for the first time, it enters the compressor preheating state. To quickly perform power-on commissioning, you can manually shut down the compressor preheating.
During routine maintenance of the lithium battery cabinet, which of the following procedure is true about replacing a faulty battery module?
For hourly statistics reports, data of up to how many days can be queried? For monthly statistics reports, data of up to how many years can be queried?
The UPS5000-H-1200 kVA and UPS5000-H-1600 kVA have two power cabinets and one bypass cabinet, and are equipped with the MDU, ECU, and surge protection box.
Which of the following is not a scenario-based solution for Huawei data center products?
During routine maintenance of the lithium battery cabinet, which of the following areas should be protected from electric shocks caused by exposed hands or metal objects?
In alarm management, the status can be identified by masking rules.
When a critical alarm is generated for the unit, the indicator on the LCD controller turns red and the buzzer beeps continuously.
|