Free Huawei H19-105_V2.0 Practice Exam with Questions & Answers

Questions 1

Which of the following does NOT accurately describe the concept behind Huawei's data center facility and critical power solution?

Options:
A.

Smart

B.

Low carbon

C.

Simple

D.

Reliable

Huawei H19-105_V2.0 Premium Access
Questions 2

Regarding the integrated UPS used in the FusionModule2000, which of the following statements are correct?

Select all that apply

Options:
A.

The integrated UPS integrates UPS input, output, air conditioner power distribution, and IT power distribution. Compared with the traditional solution, the integrated UPS saves one to two cabinets.

B.

The integrated UPS uses Huawei-developed high-density circuit breakers, reducing the size by 25%. Therefore, more power modules can be housed.

C.

Huawei integrated UPS provides up to 180 kW power per cabinet, the highest power in the industry.

D.

In FusionModule2000 6.0, the integrated UPS can supply power to IT equipment and air conditioners at the same time, ensuring uninterrupted cooling.

Questions 3

The QMS (Quality Management System) model of quality management is founded on the ISO 9000 quality system.

Options:
A.

True

B.

False

Questions 4

Which of the following statements about the validity period of Huawei Digital Power partner registration agreements are correct?

Select all that apply.

Options:
A.

Agreements signed during the first half of a calendar year (H1) expire on December 31 of the same year.

B.

Agreements signed during the second half of a calendar year (H2) expire on December 31 of the following year.

C.

Agreements signed during H1 expire on February 1 of the following year.

D.

Agreements signed during H2 expire on June 30 of the following year.

Questions 5

Which of the following statements about the Huawei prefabricated modular data center solution are incorrect?

Options:
A.

Property certificates cannot be obtained for prefabricated modular data centers. Therefore, assets must be depreciated by equipment.

B.

The FusionDC1000C uses the in-row air cooling solution.

C.

For a data center with 1000 cabinets, the TTM of the prefabricated modular construction mode is six months, excluding the time for planning and construction application and design.

D.

By default, the power supply module of the FusionDC1000C outside China includes a transformer.

Questions 6

Which of the following partner types are required to sign a framework agreement with our company once the certification decision has been made?

Select all that apply

Options:
A.

VAP

B.

Gold reseller

C.

Silver Dealer

D.

Distributor

Questions 7

Is it true or false that the standard protection rating of the FusionDC1000A is IP65?

Options:
A.

True

B.

False

Questions 8

iSitePower-S can supply customers with uninterruptible power. The power-off switchover time is less than ( ___ ) ms, with no interruption to the service.

Options:
A.

10

B.

15

C.

25

D.

20

Questions 9

Which functions are integrated into the built-in UPS unit of the FusionModule2000?

Select all that apply

Options:
A.

Modular UPS

B.

Equipment room monitoring

C.

Power distribution for cooling equipment

D.

IT cabinet power distribution

Questions 10

Which of the following are components included in the QMS model?

Select all that apply

Options:
A.

Process operations

B.

Leadership

C.

Performance appraisal

D.

Planning