Free HP HPE7-V01 Practice Exam with Questions & Answers | Set: 2

Questions 11

Your customer is planning a Scality RING solution. Approximately 750 TB of data must be stored on the SDS. The customer prefers SSD or NVMe drives.

What is true regarding this solution?

Options:
A.

HPE servers, for example, such as Alletra Storage Server 4120, can be used for Scality RING deployments.

B.

The minimum capacity for ordering Scality RING perpetual licenses is 1000TB.

C.

Scality RING Single Site Hardware Lifetime licenses are provided at a lower cost compared to perpetual licenses.

D.

Scality licenses cannot be purchased from HPE.

HP HPE7-V01 Premium Access
Questions 12

You are designing a solution for a customer that will support a virtualization workload based on HPE Synergy. Your customer has the following requirements:

    Dual-socket HPE Synergy compute nodes running ESXi 8.x with maximum memory supported

    Each node should have access to shared storage from HPE Alletra Storage MP B10000

    All virtual machines should be protected against host failure

    All virtual machines with vGPU must be protected with Fault Tolerance

    All compute nodes should boot from disks located in the D3940 Storage Modules protected with RAID 1

    All frames should be managed as one logical enclosure to simplify management

    All compute nodes should support two network ports with the maximum Ethernet connectivity speed

You are reviewing a proposal that you must verify. The proposal consists of:

    3 x HPE Synergy 12000 frames

    2 x HPE Synergy Composer2 modules

    4 x HPE Virtual Connect SE 100Gb F32 Modules for Synergy

    4 x HPE Synergy 50Gb Interconnect Link Modules

    3 x HPE Synergy D3940 Storage Modules, each with 20 SSD drives

    1152 core VMware vSphere Enterprise Plus subscriptions

    36 x HPE Synergy 480 Gen11 compute nodes

Each SY480 Gen11 is configured with:

    A single Platinum CPU with 32 cores

    HPE Synergy 6820C 25/50Gb Converged Network Adapter

    HPE Synergy 5830C 32Gb Fibre Channel Host Bus Adapter

    HPE MR416i-o Gen11 12G SAS Mezzanine Controller

Which two statements are true regarding the proposal? (Select two.)

Options:
A.

2 HPE Synergy 50Gb Interconnect Link Modules should be removed from the proposal, as the total number of interconnects required is six.

B.

HPE MR416i-o Smart RAID controller can be removed because there are no external SAS disk enclosures included in the proposal.

C.

Two HPE Virtual Connect SE 100Gb F32 Modules for Synergy can be removed from the proposal because all requirements are met without them.

D.

To access HPE Alletra MP B10000 arrays, FC upgrade licenses for HPE Virtual Connect SE 100Gb F32 Modules for Synergy must be purchased.

E.

vSphere Enterprise Plus subscriptions can be replaced with vSphere Standard subscriptions.

Questions 13

Your customer would like to implement Peer Persistence for their HPE Alletra 6000 remote replication configuration.

Which statement is true?

Options:
A.

Peer Persistence volumes require both arrays to operate as upstream.

B.

HPE Alletra 6000 arrays are always using iSCSI for synchronous replication.

C.

HPE Alletra 6000 arrays are always using FC for synchronous replication.

D.

Peer Persistence volumes are synchronously replicated over 10Gb or 100Gb IP links.

Questions 14

Your customer wants to implement a disaster recovery solution for their virtualization workload. They also want to implement a protection method that will protect the workload in case of a site failure.

Their existing environment includes the following configurations:

    All ESXi systems are located in the same datacenter

    Virtual machines are protected by an HA cluster

    Some of the VMs are protected with Fault Tolerance

    HPE Synergy 480 Gen11 is the compute platform

    HPE Alletra Storage MP B10000 array for storage

    Orchestrated failover for all VMs using VMware tools

The customer plans to replicate the same setup at the second site. The total number of virtual machines that must be protected is 200. Your customer also expects an RPO of 0.

Which component or configuration is a necessary part of a solution that will meet all customer requirements?

Options:
A.

HPE Synergy frames from the secondary site added to the logical enclosure configured in the primary site.

B.

Storage policy-based management (SPBM) must be configured for a group of the virtual machines.

C.

Synchronous replication configured between sites to replicate the volumes used to build the datastores.

D.

Asynchronous replication configured between sites used to replicate the volumes used to build the datastores.

Questions 15

Refer to exhibit from a customer’s Aruba CX switch.

show interface vxlan vni vteps

VNI : 150 VLAN : 150

Routing : Disabled VRF : default

Vxlan-status : operational

VTEPs

Origin Source Destination VTEP-STATUS

static 172.17.255.2 172.17.255.1 static operational

Which statement is true in this scenario?

Options:
A.

A static VXLAN setup needs to be created between the peer switches.

B.

An EVPN VXLAN setup will dynamically establish the VTEPs between peer switches.

C.

A Foundation license needs to be applied to the switches to scale the VXLAN configuration.

D.

A VTEP setup requires the same model of the CX switch on each location.

Questions 16

Your customer wants to implement an HPE SimpliVity stretched cluster spanning two sites to improve availability.

You are reviewing an HPE SimpliVity proposal that consists of the following components:

    12 HPE SimpliVity 380 Gen11 nodes, 8 for the primary site and 4 for the remote site, all of which have 2 CPUs, 16 cores each

    12 HPE OneView Advanced licenses

    2 HPE Alletra Storage MP B10000, 1 for the primary site and 1 for the remote site

    384 core VMware vSphere Standard subscriptions

    Two pairs of ArubaOS-CX 8325 switches

Which statement about this proposal is true?

Options:
A.

Additional VMware subscriptions should be added, as the HPE SimpliVity 380 Gen11 core count is higher than needed.

B.

In order to enable DRS functionality, vSphere Standard subscriptions should be replaced with vSphere Foundation subscriptions.

C.

A Remote Copy license should be activated on all HPE Alletra arrays to enable remote HPE SimpliVity backups.

D.

Aruba OS-CX 8325 should be enhanced with a Pensando license so HPE SimpliVity traffic can be secured.

Questions 17

You presented a solution to your customer that will replace their legacy HPE BladeSystem.

The new solution is based on the HPE Synergy platform and consists of the following components:

    5 HPE Synergy 12000 frames

    2 HPE Virtual Connect SE 100Gb F32 Modules for Synergy

    8 HPE Synergy 25/50Gb Interconnect Link Modules

    60 HPE Synergy 480 Gen11

Which statement about the business and financial benefit of the new solution for the customer is true?

Options:
A.

HPE Synergy 480 Gen11 compute modules have an extension that will allow the customer to install 4 GPUs in half-height format compute nodes.

B.

HPE Virtual Connect SE 100Gb F32 Module for Synergy can support FC traffic once an upgrade license for each module is added in HPE OneView.

C.

Compared to the legacy HPE BladeSystem, the HPE Synergy platform supports more expansion slots in the form of mezzanine cards.

D.

Compared to the legacy HPE BladeSystem, the HPE Synergy platform supports more interconnect modules, which provides better flexibility and expansion possibilities.

Questions 18

You are designing a data-center networking solution for a customer.

The design includes:

    A VXLAN/EVPN solution

    Aruba CX8325H switches as TOR switches

    Aruba CX8360 switches as core switches

How should the ports between the TOR switches and the core switches be configured?

Options:
A.

The ports should be configured as LAG member layer 2 ports to both core switches.

B.

The ports should be configured as standalone routed ports to each core switch.

C.

The ports should be configured as LAG member routed ports to both core switches.

D.

The ports should be configured as standalone layer 2 ports to each core switch.

Questions 19

Your customer has provided the CLI output of a switch to show how their devices are connected.

Refer to the output:

show arp

IPv4 Address MAC Port Physical Port State

10.0.255.2 ... vlan150 ... reachable

10.12.43.1 ... vlan1 ... reachable

10.0.255.3 ... vlan150 ... reachable

Total Number Of ARP Entries Listed: 3.

What should you consider while discussing upgrades to your customer’s environment and network components?

Options:
A.

The support for VSF stacking functionality.

B.

The support for Overlay networks is required.

C.

The support for IGMP snooping is mandatory.

D.

The support for Virtual Switching Extension is required.

Questions 20

You have been assigned to design a solution for a customer that supports a virtualization workload based on HPE Synergy. The customer has the following requirements:

- Dual-socket HPE Synergy compute nodes running ESXi 8.x with the maximum supported memory

- Each node must have access to shared storage from HPE Alletra Storage MP B10000

- All virtual machines must be protected against host failure

- All virtual machines with 8 vCPUs must be provided with Fault Tolerance

- All compute nodes must boot from disks in the D3940 Storage Modules protected with RAID 1

- All frames must be managed as one logical enclosure to simplify management

- All compute nodes must support 2 network ports with the maximum Ethernet connectivity speed

You are reviewing a proposal that must be verified. The proposal includes:

- 3 HPE Synergy 12000 frames

- 2 HPE Synergy Composer modules

- 4 HPE Virtual Connect SE 100Gb F32 Modules for Synergy

- 4 HPE Synergy 50Gb Interconnect Link Modules

- 3 HPE Synergy D3940 Storage Modules, each with 20 SSD drives

- 1152-core vSphere Enterprise Plus subscriptions

- 36 HPE Synergy 480 Gen11 compute nodes

Each SY480 Gen11 is configured with:

- A single Platinum 8562 CPU with 32 cores

- HPE Synergy 6820C 25/50Gb Converged Network Adapter

- HPE Synergy 5830C 32G Fibre Channel Host Bus Adapter

- HPE Microchip Smart RAID P416ie-m SR Gen10 12G SAS Mezzanine Controller

Which statement is true regarding the proposal?

Options:
A.

Six compute nodes should be removed as there is not enough space for 12 compute nodes and a D3940 Storage Module in a frame.

B.

OneView Advanced licenses should be added to the proposal as all of the compute nodes will be managed using HPE Composer.

C.

Six 12Gb SAS Connection Modules should be added to provide connectivity to the HPE Alletra MP B10000 storage array.

D.

Twelve 12Gb SAS Connection Modules should be added to provide connectivity to the D3940 Storage Modules.

Exam Code: HPE7-V01
Certification Provider: HP
Exam Name: Advanced HPE Edge-to-Cloud Solutions
Last Update: Nov 26, 2026
Questions: 78
PDF + Testing Engine
$169.99
$34
Testing Engine
$129.99
$26
PDF (Q&A)
$104.99
$21