Labour Day Special 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bestdeal

Master the Salesforce Certified Field Service Consultant (WI24) Field-Service-Consultant Exam with Confidence!

Questions 1

Universal Containers needs a team to perform periodic maintenance on the most complex products.

Which feature should the Consultant configure to meet this requirement?

Options:

A.

Required Resource

B.

Preferred Resource

C.

Service Crew

D.

Technicians with Required Skills

Buy Now
Questions 2

Service resources at Universal Containers (UC) frequently work in more than one service territory.

The current scheduling policy looks only at primary territory. While UC still wants the optimizer to use

the service resource’s primary territory when scheduling, UC also wants the scheduling policy to look

at the resource'’s secondary service territories.

Which two scheduling policy changes should a Consultant recommend?

Choose 2 answers

Options:

A.

Select Working Location Enable Primary on the Working Territories Work Rule:

B.

Remove the Match Territory Work Rule.

C.

Include the Mateh Territory Work Rule.

D.

Deselect Working Location Enable Primary on the Working Territories Work Rule.

Buy Now
Questions 3

Which Work Rule should a Salesforce Field Service Consultant use to assign Service Resources based on

related object records?

Options:

A.

Resource Availability

B.

Extended Match

C.

Required Resource

D.

Match Field

Buy Now
Questions 4

Universal Containers wants to prevent the lunch break from interfering with existing scheduled work.

How should a Consultant configure the Scheduling Policy to ensure a 30-minute lunch break that begins every day after 1 PM?

Options:

A.

Create a recurring Service Appointment.

B.

Use the Resource Availability Rule.

C.

Use appropriate Resource Operating Hours.

D.

Create Resource Absences every day.

Buy Now
Questions 5

Technicians often need to generate a report in the customer's language.

Which configuration should the Consultant recommend to meet the requirement?

Options:

A.

Update the Language of the current User.

B.

Add the Service Report Language field to the Work Order Page Layout.

C.

Add the Language field to the Contact Page Layout.

D.

Update the Default Language of the Organization.

Buy Now
Questions 6

Northern Trail Outfitters (NTO) asks its clients for feedback on every service visit. NTO wants to dispatch the appropriate Technicians based on customer feedback.

What are two ways the Consultant can meet this requirement?

Choose ? answers

Options:

A.

Configure and add excluded and required resource Work Rules to scheduling policies.

B.

Configure resource preferences on the Account or Work Order.

C.

Configure and add excluded and required resource business objectives to scheduling policies.

D.

Configure customer preferences on the Service Resource record.

Buy Now
Questions 7

Northern Trail Outfitters is implementing drip feed dispatching. When testing the new functionality, the drip does not dispatch appointments as expected. A consultant is engaged to troubleshoot the issue.

What is preventing the drip feed from triggering?

Options:

A.

The appointment status is going from Scheduled to Completed.

B.

The status on completed appointments can only be Canceled, Completed, or Cannot Complete.

C.

The default drip feed setting is overriding the drip feed rate on a service territory.

D.

Other scheduled jobs are dispatching appointments and exceeding the drip feed value.

Buy Now
Questions 8

A technician needs to get replacement part for damaged inventory on them for

an upcoming job.

To which object should the technician add a product request record?

Options:

A.

work types

B.

work order

C.

service appointment

D.

service report

Buy Now
Questions 9

Which three objects are associated to the Work Type? Choose 3 answers

Options:

A.

Skill Requirements

B.

Resources

C.

Service Appointments

D.

Articles

E.

Products Required

Buy Now
Questions 10

A customer makes one appointment for the sales department, and another appointment for the service

department. The two appointments should be handled on the same day, but should be created as separate

appointments. In addition, the Technician must complete one appointment before starting the next. The agent

wants to make sure these two appointments are scheduled together and in sequence.

Which three things should the Consultant verify to ensure these requirements are met and simultaneous scheduling will occur?

Choose 3 answers

Options:

A.

The checkbox Use all-or-none scheduling for related appointments in Field Service Settings is selected.

B.

The Dependency Type is set to Start After Finish and Same Day on the first service appointment in the dependency.

C.

A dependency has been created between the two appointments and the start times are the same.

D.

The Same Resource and Same Day fields appear on the Service Appointments page layout.

E.

The Complex Work Visualforce page is added to the Service Appointments page

Buy Now
Exam Code: Field-Service-Consultant
Exam Name: Salesforce Certified Field Service Consultant (WI24)
Last Update: May 20, 2024
Questions: 163

PDF + Testing Engine

$159.99
$64

Testing Engine

$119.99
$48

PDF (Q&A)

$99.99
$40