New Year Special 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bestdeal

Free EMC E20-598 Practice Exam with Questions & Answers

Questions 1

At which percentage of user capacity will EMC Avamar issue the first warning?

Options:
A.

70

B.

80

C.

85

D.

65

EMC E20-598 Premium Access
Questions 2

How many simultaneous client connections per node will an EMC Avamar server support?

Options:
A.

10

B.

15

C.

18

D.

25

Questions 3

Garbage collection is running on an EMC Avamar server. Which activities can be performed at this time?

Options:
A.

Restore, browse existing backups, and queue backups

B.

Delete backups and change retention settings

C.

Change retention settings, and modify clients and domains

D.

Restore, delete backups, and add new clients

Questions 4

Due to a scheduling conflict, an EMC Avamar administrator had to cancel the backup of a client using the Avamar Administration GUI. What happens to the backup data that had already been sent to the Avamar server?

Options:
A.

Data is retained for seven days as a partial backup

B.

Chunks from the incomplete backup will be removed at the next garbage collection

C.

Data is retained for the remainder of the retention policy that was used for the backup

D.

Data is tagged "corrupted" and will be marked recoverable at the next HFS check

Questions 5

If 9 GB is the average amount of data added to an Avamar Virtual Edition (AVE) in a mixed environment each day, what is the minimum recommended size of the AVE?

Options:
A.

0.5 TB

B.

1.0 TB

C.

2.0 TB

D.

3.3 TB

Questions 6

At which percentage of the O/S capacity does garbage collection stop running in an EMC Avamar environment?

Options:
A.

85

B.

90

C.

96

D.

100

Questions 7

What is the maximum number and types of nodes for an EMC Avamar multi-node server?

Options:
A.

7 storage, 1 utility, and 1 spare

B.

15 storage, 1 utility, 1 accelerator, and 1 spare

C.

16 storage, 1 utility, and 1 spare

D.

18 storage, 1 utility, and 1 spare

Questions 8

Which process divides the data into chunks for EMC Avamar deduplication data flow processing?

Options:
A.

Compression

B.

Hash cache checking

C.

SHA-1 Hashing

D.

Sticky-byte factoring

Questions 9

What is the function of an EMC Avamar spare node?

Options:
A.

Load balance the utility node

B.

Dynamically grow capacity

C.

Replace a failed data node

D.

NDMP accelerator

Questions 10

You are checking the network cabling on a multi-node EMC Avamar Gen4 Data Store. Which port should be used to connect the utility node to the first switch?

Options:
A.

GB1 is connected to port 1 on the switch

B.

GB1 is connected to port 5 on the switch

C.

GB2 is connected to port 1 on the switch

D.

GB2 is connected to port 5 on the switch

Exam Code: E20-598
Certification Provider: EMC
Exam Name: Backup Recovery - Avamar Specialist Exam for Storage Administrators
Last Update: Mar 26, 2025
Questions: 237

EMC Related Exams

How to pass EMC E20-555 - Isilon Solutions and Design Specialist Exam for Technology Architects Exam
How to pass EMC E20-375 - RecoverPoint Specialist Exam for Implementation Engineers Exam

EMC Free Exams

EMC Free Exams
Unlock free EMC exam resources and practice tests at Examstrack. Boost your EMC exam readiness with top-notch materials.