What is the correct order of steps to migrate from an old array to a new one without disruption using VPLEX?
A new VPLEX system has been installed that uses ESRS. The firewall administrator has opened ports 25, 9010, and 5901 between VPLEX and ESRS. A support ticket is
logged. While trying to troubleshoot, the technical support engineer cannot access the GUI of VPLEX.
Which port needs to be opened on the firewall?
What is the maximum number of synchronous consistency groups supported by VPLEX?
Why is it EMC best practice that each back-end LUN has a connection to all the A-directors and to all the B-directors in the VPLEX cluster?
What is the maximum number of virtual volumes that can be placed into a single consistency group?
A storage administrator has been tasked with encapsulating 100 LUNs across five Oracle servers from an existing array to a VPLEX Metro cluster. The administrator can obtain
the same outage window for all five servers and wants to streamline as much of the encapsulation process as possible.
What can the administrator use to help achieve this task?
What can be used to monitor VPLEX performance parameters?
What is a key VPLEX component that enables an active-active data center?
How can a VPLEX storage administrator manage array-based attributes?
Which number in the exhibit highlights the Director-A back-end ports?
PDF + Testing Engine
|
---|
$66 |
Testing Engine
|
---|
$50 |
PDF (Q&A)
|
---|
$42 |
EMC Free Exams |
---|
![]() |