Summer Special 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bestdeal

Free EMC D-SNC-DY-00 Practice Exam with Questions & Answers

Questions 1

Which protocol is used to perform an automated installation of Enterprise SONiC?

Options:
A.

HTTP

B.

SCP

C.

SFTP

EMC D-SNC-DY-00 Premium Access
Questions 2

Refer to the exhibit.

D-SNC-DY-00 Question 2

Eth 1/1 of SONiC-1 and Eth1/56 of SONiC-2 should be a routed link connecting the two Enterprise SONiC switches. No traffic is passing between them.

What is the cause of the failure?

Options:
A.

An incorrect IPv6 address type was used for interface Eth1/56 of SONiC-2.

B.

A spanning-tree is blocking the routed link.

C.

IPv6 is not enabled on interface Eth 1/1 of SONiC-1.

D.

There is a cable that is unplugged between SONiC-1 and SONiC-2.

Questions 3

What does the show vian command display?

Options:
A.

All configured VLANs

B.

Only VLANs in an active state

C.

All 4094 VLANs

Questions 4

An administrator for a service provider uses this command on a switch:

D-SNC-DY-00 Question 4

What is the result of running the command?

Options:
A.

Maps the VLAN traffic that a CVLAN identifies to a VNI on a VTEP

B.

Maps the VLAN traffic that a TPID identifies to a VNI on a VTEP

C.

Maps the VLAN traffic that an SVLAN identifies to a VNI on a VTEP

Questions 5

What does show interface breakout port slot/slot command display?

Options:
A.

The Error/Debug status of the breakout of the port

B.

The breakout modes available to that port

C.

The In Progress/Complete status of the breakout of the port

D.

The configuration of that port

Questions 6

Which three actions are required to route traffic sourced from voice servers to a dedicated Internet link''

Options:
A.

Create a class-map and attach an ACL with the IP of the next-hop to it.

B.

Create an ACL that selects IPs of voice servers

C.

Attach a policy to the egress interface

D.

Create a policy-map and attach the configured class-map and set the next-hop IP

E.

Create a class-map and attach that ACL.

Questions 7

A deployment requires routing and dynamic access control lists. What bundle must be used for this deployment?

Options:
A.

Enterprise Standard

B.

Enterprise Standard

C.

Edge Standard

D.

Cloud Premium

Questions 8

Create port channel 10 on interfaces Eth 1/11 and 1/12, so that it connects to an already configured switch. A server will be connected on Eth 1/1. Both the server and port channel need VLAN 1 untagged and only VLAN 10 tagged.

Complete the configuration on Switch A.

D-SNC-DY-00 Question 8

D-SNC-DY-00 Question 8

Options:
Questions 9

Configure the system to meet these requirements.

. Configure R1 with AS 1.

. R1 must use a static neighbor assignment for BGP peering.

. R1 needs to redistribute all current and future connected IPv4 routes.

All the required BGP configurations have already been completed on R2.

R2 resides in BGP AS 2.

D-SNC-DY-00 Question 9

D-SNC-DY-00 Question 9

Options:
Questions 10

Use the simulator to perform the following configuration task.

1. Map a single-tagged CVLAN 100 to SVLAN 200 translation on PE

switch interface Eth1/1.

2. Map a double-tagged VLAN packet with an outer CVLAN 100 and an

inner dot1q 200 to SVLAN 300 translation on PE switch interface

Eth1/2.

The necessary VLANs and VLAN stacking have already been configured.

D-SNC-DY-00 Question 10

Options: