Free AVIXA CTS Practice Exam with Questions & Answers | Set: 5

Questions 41

The BEST way to ensure that a project is on budget is to

Options:
A.

calculate the number of calendars days remaining to completion.

B.

visit the job site and determine the percentage of work completed.

C.

ask the installation team to estimate remaining work to completion.

D.

review accrued labor and material costs against remaining work.

AVIXA CTS Premium Access
Questions 42

When planning to use audio equipment on a converged enterprise network, it may be desirable to separate broadcast domains in order to

Options:
A.

avoid audio feedback between devices.

B.

avoid crosstalk between multi track channel packets.

C.

avoid delaying time sensitive AV traffic on the network.

D.

comply with local electrical and telecommunication regulations.

Questions 43

What is the FIRST stage in troubleshooting an AV system?

Options:
A.

evaluating possible sources of error

B.

identifying the symptoms of the error

C.

determining which devices are fully functional

D.

reviewing the system diagram showing the connections and the signal flow

Questions 44

Which of the following is the MOST SUITABLE security method for a small portable projector?

Options:
A.

cable lock

B.

security screws

C.

adjustable mount

D.

Nylock nuts and bolts

Questions 45

During a routine service visit, an engineer notices an LED indicator on a projector's front panel blinking regularly. What should be done?

Options:
A.

consult the projector's manual

B.

replace the projector's lamp and filters

C.

disregard because the projector is operational

D.

remove the power cable and re-boot the projector

Questions 46

"Shock Loads" for equipment mounts refer to

Options:
A.

suspended equipment not electrically isolated from Its mounting structure.

B.

sudden additional loads from earthquakes or personnel hanging from the mounts.

C.

calculated counterweight required to balance an offset load on a cantilever mount.

D.

calculated isolation required to eliminate vibration otherwise transferred to the building structure.

Questions 47

On a construction project awarded through a competitive process, the electrical contractor says that the AV company is responsible for the installation of conduit. What project document(s) would determine responsibility?

Options:
A.

estimate

B.

submittals

C.

proposal cover letter

D.

bid (tender) documents

Questions 48

The FIRST step in troubleshooting an AV system is to

Options:
A.

clearly identify the failure symptoms.

B.

change only one component at a time.

C.

ensure that all the system components have power.

D.

divide the system in half to identify the portion that is not working.

Questions 49

Microphone signal levels are typically measured in:

Options:
A.

Hertz

B.

Amperes

C.

Millivolts

D.

Milliwatts

Questions 50

The purpose of the system performance verification process is to:

Options:
A.

Conclude the installation phase and close out the project.

B.

Allow the AV contractor to send the final invoice for the project.

C.

Ensure the AV system meets substantial completion requirements.

D.

Provide a means for the AV contractor to objectively demonstrate the AV system meets performance criteria.

Exam Code: CTS
Certification Provider: AVIXA
Exam Name: CTS - Certified Technology Specialist
Last Update: Jul 9, 2025
Questions: 254

AVIXA Related Exams

AVIXA Free Exams

AVIXA Free Exams