A deployment engineer arrives on-site to install an XE9680 server. The server lift does not have the ability to maneuver beneath the XE9680 shipping pallet.
How many people must you have to physically pick up the server to place it on the lift shelf?
A deployment engineer is installing a PowerEdge XE8640 server. The rack has four PDUs. Looking at the rear of the rack, one power source provides power to the two left PDUs. A different power
source provides power to the two right PDUs.
What side of the rack should XE8640 PSU 1 and PSU 2 be connected?
What must be considered regarding stab-in rails with installing a PowerEdge XE server?
A deployment engineer is preparing to install three PowerEdge XE9680 servers in a rack supplied by the customer.
What must they before going on-site to install the servers?