Your system administrator reports an amber, non-blinking light on one of your Exadata storage disks. You immediately execute the 'list physicaldisk where diskType=HardDisk and status=failed DETAIL' command on the Exadata storage system and the specified disk is indeed reported as failed. Platinum Support has not been enabled for this system. Enterprise Manager Cloud Control is monitoring the system.
What is the next step that you should perform before you do anything else?
You have been asked by Oracle Support to check the firmware of the hard & flash disks in a storage server. Which cellcli command should you use to get this information?
You are providing oversight for the delivery of a new Exadata Database Machine.
1. Stabilize the Exadata Rack.
2. Unpack Oracle Exadata Rack.
3. Review the safety guidelines.
4. Let the Exadata acclimatize for 24 hours.
5. Power on Exadata PDU A.
6. Place Exadata in its allocated space.
7. Power on Exadata PDU B.
What is the correct order of these steps?
Which two sections of the AWR report shows statistics for X9M Persistent Memory Cache?
Which three statements are true about the CELLCLI command?
Which of the below is NOT a precaution that should be adhered to in order to ensure the site is safe and ready for
You have been asked to design a backup solution for an Exadata X9M-2 Quarter Rack with Extreme Flash Storage Servers connected to a new ZFS Storage Appliance ZS7 with 2 Storage Controllers with 100Gb Ethernet cards and 3 Storage Trays. You are using Oracle Exadata Configuration Assistant to validate the rack layout.
1. Use "Add Equipment" to add the Exadata X9M EF Storage Servers, starting from RU10.
2. Use drop down to add ZFS Storage Appliance Controllers.
3. You cannot add ZFS Storage Appliance to an Exadata Rack.
4. Use "Add Equipment" to add the ZFS Storage Trays, starting from RU1.
5. Use drop down to add ZFS Storage Trays.
6. Use "Add Equipment" to add the Exadata X9M Database Servers, starting from RU16.
7. Use "Add Equipment" to add the Exadata X9M EF Storage Servers, starting from RU1.
8. Use drop down to add Exadata X9M EF Storage Servers.
9. Use "Add Equipment" to add the ZFS Storage Controllers, starting from RU27.
10. Use drop down to add Exadata X9M Database Servers.
11. Use "Add Equipment" to add the ZFS Storage Trays, starting from RU31.
Which of these steps are correct and what is their correct order?
Which four actions should you take before proceeding with applying updates to your Exadata Database Machine?
You are hardening the security posture of your Exadata Database Machine. Before disabling ssh access to the storage servers, what should you do to enable REST access to the MS process?
Which two statements are true about the initial storage configuration after the standard (non-virtualized) deployment of a new Exadata Database Machine with High Capacity storage servers?