Questions 1

A Production Supervisor queries a work order, WO-1025, from the Manage Work Orders page. On the Entering Edit Work Order: WO-1025 page, the supervisor finds a General Information, Operations, and History tab, but no Reservations tab.

What are two reasons for the Reservations tab not being displayed for WO-1025?

Options:
A.

It is not a Configured Item work order.

B.

It Is not a Drop-Ship work order.

C.

It is not a Pick-to-Order work order.

D.

It is not a Plan-to-Produce work order.

E.

It is not a Back-to-Back work order.

Oracle 1z0-1075-24 Premium Access
Questions 2

Your customer has multiple distribution centers and a few manufacturing plants. The plants manufacture different items with some overlap between them. The distribution centers stock parts from all plants.

A Corporate Engineering team is responsible for centrally defining items and catalogs. This team defines the items and sets the attributes for most parameters. The respective distribution centers and manufacturing plants must be allowed to change some attributes locally.

What is the best way to achieve this?

Options:
A.

Set up plants, distribution centers, and the Corporate Engineering organization as inventory organizations.

B.

Set up plants and distribution centers as inventory organizations, and the Corporate Engineering organization as an Item organization.

C.

Set up plants and the Corporate Engineering organization as item organizations, and distribution centers as inventory organizations.

D.

Set up plants and the Corporate Engineering organization as Inventory organizations, and distribution centers as item organizations.

E.

Set up plants as inventory organizations, and distribution centers and the corporate Engineering organization as item organizations.

Questions 3

Which three are Cost accounting methods'

Options:
A.

Perpetual Average Cost

B.

Layer Cost, also known as "LIFO"

C.

Frozen Standard Cost

D.

Actual Cost, also known as "FIFO"

E.

Periodic Actual Cost

Questions 4

In the work execution area, which three infolets are provided to users for instant access?

Options:
A.

Work Order Performance

B.

Scrap

C.

Operation Exception

D.

Operation Efficiency

E.

work order Exception

Questions 5

Your client's company is in a regulated industries and must keep detailed records of their product manufacturing processes in accordance with the United States Food and Drug Administration (FDA) regulation on electronic records and signatures called 21 Code of Federal Regulations (CFR) Part 11.

You are implementing Oracle E-Signatures and E-Records for securely capturing, storing, retrieving, and printing electronic records and signatures in manufacturing. They enable Deferred Electronic Records and Electronic Signatures for Manufacturing Work Order Release in Oracle Manufacturing Cloud.

Which statement is NOT true about using Deferred Electronic Records and Electronic Signatures for Manufacturing Work Order Release?

Options:
A.

It generates e-records on initial work order release through UI and sends notifications to approvers.

B.

Using a deferred approval process with notifications, the work order is held in "Released" status until the approvals are obtained.

C.

If the e-record is rejected, you can optionally resubmit the rejected electronic records.

D.

These capabilities are supported for discrete and process work orders.

Questions 6

A Production Operator needs to load work order operation transactions from an external system into Manufacturing Cloud.

What is the correct sequence of tasks to achieve this?

Options:
A.

Export file to UCM server > Load data to data repository > Process import operations transactions > Load file from UCM to interface table.

B.

Load data to data repository > Load file from UCM to interface table > Export file to UCM server > Process import operations transactions.

C.

Load data to data repository > Export file to UCM server > Process import operations transactions > Load file from UCM to Interface table.

D.

Load data to data repository > Export file to UCM server > Load file from UCM to interface table > Process import operations transactions.

Questions 7

An employee is responsible for dealing with different manufacturing practices and processes, machines, tools, and equipment that turn raw material into a product.

Which seeded job role must you assign to this employee?

Options:
A.

Manufacturing Engineer

B.

Production Engineer

C.

Manufacturing Supervisor

D.

Production Operator

E.

Production Supervisor

Questions 8

You are implementing project-driven supply chain functionality. You need to set up movement requests to issue or transfer project material to manage the inventory associated with projects and tasks.

Which two are types of movement requests to issue or transfer project material?

Options:
A.

Transfer project material from one subinventory to another.

B.

Pick transactions Interfaced by the project costing project and task using the project material, common Inventory, or Inventory from another project.

C.

Create o movement receipt line with the Project Costing widget.

D.

Perform manual pick for such movement requests using the project material, common inventory, or inventory from another project.

Questions 9

Which is NOT a required setup task for Manufacturing master data?

Options:
A.

Manage Production Resources

B.

Manage Plant Parameters

C.

Manage Work Centers

D.

Manage Work Areas

E.

Manage Plant Profiles

Questions 10

In which three ways does Supply Chain Orchestration enrich supply requests with project details to support outside processing for a project-specific work order?

Options:
A.

Supply Chain Orchestration initiates the creation of a purchase order without the work order.

B.

Expenditure Item Date Is set to the requested need-by date and Expenditure Organization is set to the manufacturing plant.

C.

Expenditure Item Date is set to the receipt date and Expenditure Organization is set to the manufacturing plant.

D.

Supply Chain Orchestration initiates the creation of a requisition with the project details.

E.

Expenditure Type is sat to the expenditure type associated to the outside processing Item.