Assume that the optical power transmitted by a 62.5/125 multimode fiber is distributed uniformly across its core. If this fiber is perfectly coupled (i.e., the two fibers are aligned and abutted) to a 50/125 fiber, what is the percent of power that is lost?

Options:

A.

0 percent

B.

36 percent

C.

50 percent

D.

80 percent

E.

100 percent

Buy Now
Questions 52

Which characteristic is an advantage of copper based media over optical fiber cable?

Options:

A.

Weight

B.

Corrosion resistance

C.

Ability to handle analog signals

D.

Susceptibility to EMI

E.

Very high data rates

Buy Now
Questions 53

If the input signal power to a communication system is 1 W and the output power is 1 mW, the system attenuation is:

Options:

A.

3 dB

B.

20 dB

C.

30 dB

D.

40 dB

E.

1000 dB

Buy Now
Questions 54

You must place CAT6 cable above a factory floor with automated welding machines and hammer forges. Of the following, what type of shielding would be most effective?

Options:

A.

Multi-layer braid

B.

Foil and braid

C.

Solid metallic conduit

D.

Flex metallic conduit

E.

Sch. 40 PVC conduit

Buy Now
Questions 55

Which is an advantage of stranded conductors over solid conductors?

Options:

A.

Less costly

B.

Simpler terminations

C.

Better high frequency performance

D.

More flexible

Buy Now
Questions 56

The standard floor space coverage area for each building automation system (BAS) is a BAS outlet or device for every ________ of floor space.

Options:

A.

9.3 sq m (100 sq ft)

B.

23 sq m (250 sq ft)

C.

31 sq m (330 sq ft)

D.

56 sq m (600 sq ft)

E.

84 sq m (904 sq ft)

Buy Now
Questions 57

Which type of cable tray is best described as a ventilated bottom with side rails?

Options:

A.

Ventilated channel

B.

Ladder

C.

Spline

D.

Ventilated trough

E.

Basket tray

Buy Now
Questions 58

An existing ceiling raceway system has 115,000 sq mm (177 sq in) of cross-sectional area available for distribution of cable runs. How many can be served by the existing system?

Options:

A.

115

B.

160

C.

177

D.

189

E.

195

Buy Now
Questions 59

Cables are installed in a ceiling in a straight line. The ceiling run is 60 m (200 ft) in length. What is the MINIMUM number of J-hooks required to support the cables?

Options:

A.

20

B.

30

C.

40

D.

50

E.

60

Buy Now
Questions 60

You are designing a horizontal pathway system where you will provide 100 mm (4 in) conduit and pull boxes. The building architectural elements will only allow for a single layer of conduits (not stacked). The main horizontal pathway system consists of five 100 mm (4 in) conduits. Large single sheath copper cables are not expected to be placed. Which of the following is the MINIMUM width pull box that is to be provided?

Options:

A.

600 mm (24 in)

B.

900 mm (36 in)

C.

1220 mm (48 in)

D.

1520 mm (60 in)

E.

1830 mm (72 in)

Buy Now
Exam Code: RCDD-002
Exam Name: BICSI Registered Communications Distribution Designer - RCDD
Last Update: Dec 13, 2024
Questions: 361

PDF + Testing Engine

$164.99
$66

Testing Engine

$124.99
$50

PDF (Q&A)

$104.99
$42