How to Pass the PRINCE2 Prince2-Foundation Exam: Comprehensive PRINCE2-Foundation written Exam Guide and Tips

Questions 61

Which of the following statements about the Closing a Project process are true?

1. The Closing a Project process provides a fixed point for the receipt of completed Work Packages for the work performed in the final stage.

2. The Closing a Project process provides a fixed point to review if the objectives set out in the original Project Initiation Documentation have been achieved.

Options:
A.

Only 1 is true

B.

Only 2 is true

C.

Both 1 and 2 are true

D.

Neither 1 or 2 are true

PRINCE2 Prince2-Foundation Premium Access
Questions 62

How should the Team Manager report that tolerances are forecast to be exceeded?

Options:
A.

Create an Exception Report

B.

Create a Highlight Report

C.

Raise an issue

D.

Grant a concession

Questions 63

Which is assumed to be a customer's responsibility in the PRINCE2 customer/supplier environment?

Options:
A.

Specify the desired result

B.

Provide the resources and skills to deliver the desired result

C.

Ensure the technical integrity of a project

D.

Develop a project's products

Questions 64

Which is an objective of the Closing a Project process?

Options:
A.

Review and approve the plan for project closure

B.

Review the performance of the project against its baseline

C.

Perform any post-project reviews

D.

Create a Benefits Review Plan

Questions 65

Which is NOT a purpose of a Benefits Review Plan?

Options:
A.

Define the period over which the cost-benefit analysis will be based

B.

Describe how to measure the performance of the project's products in operational use

C.

Define the scope, timing and ownership of the benefit reviews required

D.

Describe how to measure and confirm any benefits that are to be realised after the project is closed

Questions 66

Which is a type of issue?

Options:
A.

A lesson

B.

A request for change

C.

An Exception Report

D.

A risk with an estimated high impact

Questions 67

Which are purposes of the quality theme?

1. To implement continuous improvement during the project

2. To establish how the project will ensure that products created will be acceptable to key stakeholders

3. To ensure that the project is desirable and achievable

4. To identify, assess and control uncertainty

Options:
A.

1 and 2

B.

2 and 3

C.

3 and 4

D.

1 and 4

Questions 68

According to PRINCE2, which characteristic is necessary for an effective project board?

Options:
A.

An ability to delegate

B.

An attention to detail

C.

A calm management style

D.

A 'problem-solving' approach

Questions 69

Which is a minimum requirement for applying the quality theme?

Options:
A.

Appraisal methods of quality control must be carried out on products

B.

A record must be kept of all the quality management activities that are planned

C.

The quality review technique must be used when reviewing products

D.

The quality management approach must align with corporate standards

Questions 70

To meet the minimum requirements for applying the progress theme, what must be considered?

Options:
A.

How lessons will be learned

B.

How time-driven reports will be produced

C.

Which management products will be baselined

D.

Who is responsible for reporting on progress