Universal Containers has a SOAP-based integration that runs nightly to update the Product(Product2) object in Salesforce with updated product availability for over 500,000 products. The source system is a green-screen ERP that must be takenoffline to produce nightly production reports, such as the inventory availability report used for this integration. The integration is performing very slowly and does not complete within the allocated four-hour time slot. What three recommendations might aTechnical Architect make to resolve this issue? Choose 3 answers
Which two options should be considered to permit automatic retry of failed updates when loading data into Salesforce?Choose 2 answers
When making an Apex callout, what approach should an Integration Architect recommend for securely transporting sensitive data from Salesforce over an unsecure network connection?
Which two approaches should anIntegration Architect recommend to allow access to on-premise systems by Salesforce? Choose 2 answers
PDF + Testing Engine |
---|
$66 |
Testing Engine |
---|
$50 |
PDF (Q&A) |
---|
$42 |
Salesforce Free Exams |
---|
|