A Factorial Experiment based on a Level 2 Design with 6 factors would require 16 runs to fully assess the interactions.
To be an effective Lean Six Sigma practitioner one must understand the difference between ___________________________.
Using this data calculate the percentage of DPU.
Data: 763 defects, 18,000 units.
The primary objective in removal of waste is to improve the Order Production Cycle where the time from _________________ to the time of receipt of payment is compressed.
Appropriate measures means that measurements are ______________.
A statistical test or Hypothesis Test is performed to reject or fail to reject a stated hypothesis and it converts the Practical Problem into a Statistical Problem.
The Lean toolbox includes all of these items except ________________.
The Lean toolbox includes all of the following items except __________.
Which statement(s) are correct about the Factorial Plot shown here? (Note: There are 3 correct answers).
A Lean Six Sigma project is attempting to reduce inventory days. The Process Capability will be monitored as part of the Control Phase to track the sustainability of the improvement.
Which distribution type is best used for performing the Capability Analysis?
PDF + Testing Engine
|
---|
$66 |
Testing Engine
|
---|
$50 |
PDF (Q&A)
|
---|
$42 |
IASSC Free Exams |
---|
|