How to Easily Pass the Huawei H19-321 Exam: Expert Advice

Questions 61

why data center L1 construction to do total integration (multiple choice)

Options:

A.

20% shorter delivery times

B.

Efficiency increased by N times

C.

TCO Save 10%.

D.

Designed and obtained

Buy Now
Questions 62

UniSTAR SCT Configurator "Batch Setup Service" function, which service products are available? (Multiple choice)

Options:

A.

Technical Support Services

B.

Install the service

C.

Media retention

D.

Training services

E.

Elevate your service

Buy Now
Questions 63

The scope of work of the engineer's on-site service includes (multiple choice)

Options:

A.

Weekly/monthly report on daily fault handling and operation

B.

Problem tracking and upgrading and troubleshooting with Huawei TAC

C.

Routine inspections and reports

D.

Service customization and network optimization services

E.

Equipment relocation services

Buy Now
Questions 64

What are the professional service products involved in the sale of the network scenario of the two places and three centers? (Multiple choice)

Options:

A.

IP Network Planning and Design Services

B.

IP Network Solution Implementation Services

C.

IP network optimization services

D.

Smart NOS

Buy Now
Questions 65

What are the needs and challenges that customers face when running and maintaining the network? (Multiple choice)

Options:

A.

Fault recovery is timely

B.

Network operation is secure

C.

Maintenance skills improved

D.

Reduced O&M costs

Buy Now
Questions 66

What are the service components that the WLAN Planning and Design Service does not involve? (Multiple choice)

Options:

A.

Integrated wiring

B.

Needs research

C.

Interference testing

D.

Noise test

Buy Now
Questions 67

What is not the key point of data center L1 total integration service expansion?

Options:

A.

Project initiation phase

B.

Brand operation

C.

Competition-based bid guidance

D.

Operational optimization recommendations

Buy Now
Questions 68

Optical network evaluation optimization service is the main service of transmission professional services, as long as it includes three major service products: WDM network evaluation optimization, SDH network evaluation optimization, and microwave network evaluation optimization.

Options:

A.

True

B.

False

Buy Now
Questions 69

The data center L1 integration project feedback should contain (multiple choice)

Options:

A.

Customer capital budget and construction time requirements

B.

Customer relationship support, channel cooperation progress

C.

Key competitor dynamics

D.

Currently in the operational phase of the project

Buy Now
Questions 70

What are the characteristics of disaster recovery system management in the active-active solution? (Multiple choice)

Options:

A.

Visualize the disaster recovery topology

B.

One-click disaster recovery switching

C.

Flexible testing and walkthroughs

D.

End-to-end disaster recovery monitoring

Buy Now