Questions 91

Which of the following BEST describes the relationship between test planning and test execution? [K2]

Options:

A.

Test planning ensures the level of detail in test procedures is appropriate for test execution

B.

Test planning schedules test execution but does not assign resources

C.

Test planning defines the overall approach to testing but does not schedule specific activities such as test execution

D.

Test planning identifies test objectives related to scope and risk but does not define the level of detail for test procedures used in test execution

Buy Now
Questions 92

Which of the following would be appropriate test objectives for user acceptance testing of the first release of a new software product aimed at a general market and built using Agile methods? [K2]

a. To identify as many defects as possible

b. To maximise code coverage

c. To ensure the product works as expected

d. To assess the overall quality of the product

e. To determine the reliability of the product

Options:

A.

b and c

B.

a and d

C.

b and e

D.

c and d

Buy Now
Questions 93

What can testing demonstrate?

Options:

A.

Testing can demonstrate that there are no defects

B.

Testing can demonstrate that there are defects

C.

Testing can demonstrate that the software is correct

D.

Testing can demonstrate that there are no hidden defects in the software

Buy Now
Questions 94

What is static analysis?

Options:

A.

The decision between using white or black box test techniques.

B.

Executing software to validate the most common path through the code.

C.

A technique to find defects in software source code and software models, performed without executing code.

D.

It is a testing technique used during system testing.

Buy Now
Questions 95

Which statement correctly describes debugging? [K2]

Options:

A.

Testers identify defects, developers locate and correct defects, testers confirm the correction has cleared the original defect

B.

Developers identify defects, testers locate defects, developers correct and confirm the correction has cleared the original defect

C.

Testers identify and locate defects, developers correct defects and confirm the correction has cleared the original defect

D.

Developers identify, locate and correct defects, testers confirm the correction

has cleared the original defect

Buy Now
Questions 96

Which of the following statements is most true about test conditions?

Options:

A.

An item or event of a component or system that can be verified by one or more test cases.

B.

The grouping of a composite set of test cases which, when tested as a whole, reveal a positive or negative result.

C.

A testable component derived from business requirements.

D.

Applies to software testing only.

Buy Now
Questions 97

Test script TransVal 3.1 tests transaction validation via screen TRN 003B. According to the specification (PID ver 1.3 10b iv) the validation screen should not accept future dated transactions. Test script TransVal 3.1 passes. Test script eod 1.4 tests end of day processing and is run after the execution of TransVal 3.1 using data entered during that test

Which of the following is the BEST detail on an incident report? [K3]

Options:

A.

Title. End of Day failure.. Reproducible. Yes. Description. Script eod 1.4 fails when the first transaction of the day is a future dated transaction. Screen shot of the failure attached.

B.

Title. Transaction input screen validation..Reproducible. Yes. Description. Script eod 1..4 fails . Screen shot of the failure attached. Validation of transaction entryon screen TRN-003B should not allow future dated transactions – see PID ver 1.3 para 10b iv.

C.

Title. Screen TRN-003B validation of transaction date.. Reproducible. No. Description. When a future dated transaction is processed by the end of day process, a failure can occur. This does not always happen. Screen shot of the failure attached.

D.

Title. Screen TRN-003B validation of transaction date. Reproducible. Yes. Description. Script eod 1.4 fails when the first transaction of the day is a future dated transaction. Screen shot of the failure attached. Validation of transaction entry on screen TRN-003B should not allow future dated transactions – see PID ver 1.3 para 10b iv.

Buy Now
Questions 98

Refer to the exhibit

The following test cases need to be run, but time is limited, and it is possible that not all will be completed before the end of the test window

CTFL_Syll2018 Question 98

The first activity is to run any re-tests, followed by the regression test script. Users have supplied their priority order to tests.

Which of the following gives an appropriate test execution schedule, taking account of the prioritisation and other constraints? [K3]

Options:

A.

b, c, g, d, e, i, a, f, h

B.

a, c, d, b, g, e, i, f, h

C.

c, a, d, b, e, g, i, h, f

D.

d, c, a, e, b, g, i, f, h

Buy Now
Questions 99

The four test levels defined for a common V-model testing approach are:

Options:

A.

Unit, integration, system and maintenance.

B.

Functional, glass box, incremental and maintenance.

C.

Component, integration, system and acceptance.

D.

Unit, component, functional and alpha/beta.

Buy Now
Questions 100

Which of the following statements best characterises maintenance testing? [K2]

Options:

A.

Maintenance testing is triggered by changes to delivered software and uses impact analysis to minimise the amount of regression testing needed

B.

Maintenance testing is triggered by changes to software under development before initial delivery and uses the test plan to determine how much regression testing to do

C.

Maintenance testing is triggered by changes to the test environment and uses testing tools to perform regression testing

D.

Maintenance testing is triggered by changes to the software environment and uses structural testing to ensure the changes function correctly

Buy Now
Exam Code: CTFL_Syll2018
Exam Name: ISTQB Certified Tester Foundation Level (Syllabus 2018)
Last Update: Dec 14, 2024
Questions: 365

PDF + Testing Engine

$164.99
$66

Testing Engine

$124.99
$50

PDF (Q&A)

$104.99
$42

iSQI Free Exams

iSQI Free Exams
Examstrack offers comprehensive free resources and practice tests for iSQI exams.