Effective Study Techniques for the ISTQB CTFL-Foundation Exam

Questions 61

Which of the following is a Black Box test design technique?

Options:

A.

Decision Coverage

B.

Error Guessing

C.

Statement Coverage

D.

Equivalence Partitioning

Buy Now
Questions 62

Which option BEST describes how the level of risk is determined?

Options:

A.

The likelihood of an adverse event happening multiplied by the cost of preventing it

B.

The consequences of a potential problem multiplied by the cost of possible legal action

C.

The impact of an adverse event multiplied by the likelihood of that event occurring

D.

The likelihood and the probability of a hazard occurring

Buy Now
Questions 63

Which of the following optionsBESTexplain the pesticide paradox principle of testing?

Options:

A.

If we do not regularly review and revise our tests, we'll stop finding defects

B.

Repeatedly running a set of tests will ensure that a system is defect free

C.

Defects are, paradoxically, often contained in a small number of modules

D.

Testing, like spraying pesticide, is an effective bug / defect removal activity

Buy Now
Questions 64

Which of the following would NOT be a common metric used for monitoring test preparation and execution?

Options:

A.

Number of Test cases passed and failed

B.

Percentage of planned test cases designed

C.

Number of test plan review comments

D.

Percentage of tasks complete in test environment preparation

Buy Now
Questions 65

A live defect has been found where a code component fails to release memory after it has finished using it.

Which of the following tools would have been the MOST effective at detecting this defect prior to live implementation?

Options:

A.

Dynamic analysis tool

B.

Monitoring tool

C.

Configuration management tool

D.

Coverage measurement tool

Buy Now
Questions 66

Testing effort can depend on a number of factors, which one of following is MOST likely to impact the amount of effort required?

Options:

A.

The predicted number of defects and the amount of rework required

B.

The ratio of developers to testers in the project team

C.

The planned use of a project management tool to schedule tasks

D.

The responsibilities for testers and developers being clearly defined

Buy Now
Questions 67

Debugging and Testing are key activities in the software development lifecycle.

Which of the following are 'Debugging' activities?

a) Identifying, a failure

b) Locating the cause of failure

c) Fixing the defect

d) Checking the fix has resolved the failure

Options:

A.

a & d

B.

a & b

C.

b & c

D.

c & d

Buy Now
Questions 68

Your company is developing a system with complex business rules and many branches in the structure of its code components. You need to choose one black box technique and one white box technique for test case design.

Which one of the following offers the BEST choice?

Options:

A.

Statement testing and exploratory testing

B.

Decision testing and equivalence partitioning

C.

Decision testing and decision table testing

D.

Boundary value analysis and decision table testing

Buy Now
Questions 69

Which of the following is a defect that is more likely to be found by a static analysis tool than by other testing techniques?

Options:

A.

Omission of a major requirement

B.

Inadequate decision coverage

C.

Component memory leakage

D.

Variables that are not used improperly declared

Buy Now
Questions 70

Your task is to compile a test execution schedule for the current release of software.

The system specification states the following logical dependencies:

• An admin user must create/amend/delete a standard user.

• A standard user is necessary to perform all other actions.

The test plan requires that re-tests must be performed first, followed by the highest priority tests. To save time, the test plan states that tests should be scheduled to create test data for the subsequent tests in the schedule.

The following test cases have been designed, with an indication of priority (1 being the highest priority) and whether the test has previously failed.

CTFL-Foundation Question 70

Which test execution schedule meets the test plan requirements and logical dependencies?

Options:

A.

a, d, c, b, e

B.

a, c, b, d, e

C.

e, a, b, c, d

D.

e, a, d, c, b

Buy Now