ASQ CSSBB Exam Made Easy: Step-by-Step Preparation Guide

Questions 51

On a _________________ one can see a pattern from the graphed points such that conclusions can be drawn about the largest family of Variation.

Options:
A.

Multi-Vari Chart

B.

Weighted Scale

C.

X-Y Matrix

D.

Poisson Chart

ASQ CSSBB Premium Access
Questions 52

Which of these elements are not included in Implementation plans?

Options:
A.

Work breakdown structure

B.

Cost/Benefit ratios

C.

Risk management plans

D.

Planned audits of work completion

Questions 53

Which statement(s) are incorrect about Fractional Factorial Designs?

Options:
A.

A Half Fractional Design for 5 factors has the same number of experimental runs as a Full Factorial Design for 4 factors assuming no repeats or replicates or Center Points

B.

Quarter Fractional experiments can exist for those with 4 factors

C.

Resolution V design is desired while controlling costs of experimentation

D.

Half Fractional experiments do not exist for those designs with only 2 factors

Questions 54

Which one of these tools is frequently used to help drill down to possible causes once a Fishbone Diagram is constructed?

Options:
A.

3 When Analysis

B.

5 Why Analysis

C.

Ishikawa Diagram

D.

Skeleton Diagnostic

Questions 55

If a Six Sigma project was to reduce changeover times and the team found the project success was decreasing over time since changeover times began to creep back up, which Lean tools should be considered in the Control Phase to reestablish and sustain the project success?

Options:
A.

Improve the lighting to assure adequate visibility

B.

Confirm a Visual Factory exists to assure proper communication of status of machines

C.

Implement Kanbans to assure enough inventory for the process step

D.

Reword the standardized work instructions to use active verbs and not passive phrases

Questions 56

The Control Limits width varies if the sample size varies for which type of chart?

Options:
A.

P Charts

B.

NP Charts

C.

Xbar-R Charts

D.

Time Series Charts

Questions 57

One of the primary deliverables from performing a SIPOC is to begin to understand which inputs have the greatest affect on the ______________ outputs.

Options:
A.

Management’s desired

B.

Supplier delivered

C.

Process operator

D.

Customer most valued

Questions 58

Assessing process proportion as opposed to evaluating a process with respect to a set target can be done using one or more of these. (Note: There are 2 correct answers).

Options:
A.

Process proportion equals some desired value

B.

Process proportion equals some value range

C.

Target is current

D.

When we deal with Attribute type data

E.

Proportion of the tail is equal

Questions 59

Fractional Factorial, ____________and Response Surface Method are types of planned experiments.

Options:
A.

Multi-Vari Analysis

B.

Baldridge Channels

C.

One Factor at a Time or OFAT

D.

Factorial Design

Questions 60

For Attribute Data, Process Capability is defined as the average proportion of nonconforming products.

Options:
A.

True

B.

False

Exam Code: CSSBB
Certification Provider: ASQ
Exam Name: Certified Six Sigma Black Belt
Last Update: Jan 24, 2025
Questions: 300