Black Friday Special 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bestdeal

ASQ CSSBB Exam Made Easy: Step-by-Step Preparation Guide

Questions 21

Handling of warranty returns, process improvement team meetings and rework to meet customer expectations are all examples of business costs that are classified as ________________ .

Options:

A.

Nuisance

B.

Non-value Add

C.

Necessary

D.

Unavoidable

Buy Now
Questions 22

A ___________ is used primarily to track the stability of the average value of a metric of interest.

Options:

A.

NP Chart

B.

Xbar-R Chart

C.

I-MR Chart

D.

C Chart

Buy Now
Questions 23

When a Belt properly analyzes the results of an experiment he must examine the Residuals in expectation of finding all of the following except _________.

Options:

A.

Some Residuals higher than others

B.

Residuals will represent a Linear Regression

C.

All Residuals within 2 Standard Deviations of the Mean

D.

Some Residuals lower than others

Buy Now
Questions 24

Which one of the listed tools is frequently used to help drill down to possible causes once a Fishbone Diagram is constructed?

Options:

A.

3 When Analysis

B.

Skeleton Diagnostic

C.

Ishikawa Diagram

D.

5 Why Analysis

Buy Now
Questions 25

With Measurement System Analysis we are concerned with two issues that impact the potential variability of the data. They are _____________________.

Options:

A.

Precision and Accuracy

B.

Reliability and Repeatability

C.

Error and Spread

D.

Sensitivity and Deflection

Buy Now
Questions 26

For a Kanban to be successful which of these must occur?

Options:

A.

Consistent cycle times

B.

Fairly stable process demand of product or service

C.

Low defect rate of incoming product or service

D.

All of the above

Buy Now
Questions 27

Upon completion and validation of an improvement to a process a Belt and the Project Team create a Control Plan that contains which of these?

Options:

A.

Standard operating work description of the process change

B.

Description of the monitoring system in place to assure continued compliance

C.

Summary of the targeted critical metrics for process performance measurement

D.

All of the above

Buy Now
Questions 28

For her injection molding project a Belt needed to track the percentage of defectives of a particular sample set so she used a ___________ to display the data?

Options:

A.

Individual Chart

B.

C Chart

C.

Xbar Chart

D.

P Chart

Buy Now
Questions 29

Screening experiments are the proper choice when a Belt is faced with the situation of highly Fractional Factorial Designs.

Options:

A.

True

B.

False

Buy Now
Questions 30

Using this partial Z Table, how many units from a month’s production run are expected to not satisfy customer requirements for the following process?

Upper specification limit: 7.2 Lower specification limit: 4.3 Mean of the process: 5.9 Standard Deviation: 0.65 Monthly production: 450 units

Options:

A.

3

B.

7

C.

10

D.

12

Buy Now
Exam Code: CSSBB
Exam Name: Certified Six Sigma Black Belt
Last Update: Dec 12, 2024
Questions: 300

PDF + Testing Engine

$164.99
$66

Testing Engine

$124.99
$50

PDF (Q&A)

$104.99
$42