New Year Special 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bestdeal

ASQ CSSBB Exam Made Easy: Step-by-Step Preparation Guide

Questions 11

All the data points that represent the total set of information of interest is called the ________________ .

Options:
A.

Population

B.

Sample

C.

Frame

D.

Spread

ASQ CSSBB Premium Access
Questions 12

When we compare short-term and long-term Capability which of these is true?

Options:
A.

Cp is better for the short term

B.

Both short-term and long-term performance are alike

C.

Performance tends to improve over time

D.

Cp is better for the long-term

Questions 13

The two types of data that are to be used in Statistical Analysis are Attribute and Variance.

Options:
A.

True

B.

False

Questions 14

As a means of measuring the effects on other areas of a process as a result of changes in the primary metric we also define and track ________________.

Options:
A.

Parallel process metrics

B.

Secondary metrics

C.

Tertiary metrics

D.

Industry standards

Questions 15

What is the Ppk of a process with a spread of 24 units, an average of 68, an upper limit of 82 and a lower limit of 54?

Options:
A.

1.68

B.

2.00

C.

4.00

D.

4.42

Questions 16

A ___________ problem in the Measurement System suggests that there is a lack of consistency in the measurement over time.

Options:
A.

Linearity

B.

Bias

C.

Stability

D.

Magnitude

Questions 17

From the variance F-test shown above, which of these conclusions is/are valid?

CSSBB Question 17

Options:
A.

The variance between the class score distribution is not significantly different

B.

This test applies only to Normal Distributed data at 99 % confidence

C.

The variance between the class score distribution is significantly different

D.

There are not enough data points to make any statistical conclusions

Questions 18

Six Sigma is a business improvement discipline whose fundamental view is based on a _________ oriented approach of the business.

Options:
A.

Profit

B.

Performance

C.

Process

D.

Predatory

Questions 19

The relationship between a response variable and one or more independent variables is investigated and modeled by use of which of these?

Options:
A.

X-Y Matrix

B.

Baldridge Assessment

C.

Critical X's Definition

D.

Analysis of Variance (ANOVA)

Questions 20

The primary objective in removal of waste is to improve the Order Production Cycle where the time from _________________ to the time of receipt of payment is compressed.

Options:
A.

Shift start

B.

Product development

C.

Receipt of an order

D.

New fiscal year

Exam Code: CSSBB
Certification Provider: ASQ
Exam Name: Certified Six Sigma Black Belt
Last Update: Jan 19, 2025
Questions: 300