New Year Special 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bestdeal

Get Certified: Proven Methods to Pass the Software Certifications CSQA Exam

Questions 106

Which of the following is not one of the phases of 'Team Development' ?

Options:
A.

Performing

B.

Forming

C.

Conforming

D.

Storming

Questions 107

In the PDCA cycle, if a check detects an abnormality, then record the abnormality and continue the work per the procedure.

Options:
A.

True

B.

False

Questions 108

The team member is told what to do, and then how to check that what was done was done correctly. This statement shows relationship between:

Options:
A.

Plan and Do Processes

B.

Plan and Check Processes

C.

Do and Check Processes

D.

Do and Act Processes

Questions 109

Which of the following is the correct definition of the Quality Attribute Maintainability?

Options:
A.

Effort required to ensure that the system performs as its intended

B.

Effort required to locate and fix an error in an operational system

C.

Extent to which a program satisfies its specifications

D.

Extent to which a program can be expected to perform its intended function

E.

None of the above

Questions 110

Which of the following activities should occur before processes are defined to ensure that the most critical processes are defined first.

Options:
A.

Do

B.

Design

C.

Implementation

D.

Check

E.

None of the above

Questions 111

Which is NOT an objective baseline measure?

Options:
A.

Lines of code

B.

Number of abnormal terminations

C.

Help desk empathy with customer's situation

D.

Number of programs

Questions 112

Example(s) of traditional management philosophy are:

Options:
A.

Fire fighting

B.

Refine the process

C.

Teamwork

D.

A and C

E.

All the above

Questions 113

Which of the following defines special cause of variation?

Options:
A.

Variation between the upper and lower control limits

B.

Variation not present in the process

C.

Conditions that regularly contribute to variability

D.

Contributes a small portion to control variation of process outputs

E.

Regular contributors to variability

Questions 114

If a programmer follows a series of steps to write a computer program, the programmer is following:

Options:
A.

A Workbench

B.

A Procedure

C.

A Standard

D.

Entry Criteria

E.

Exit Criteria

Questions 115

Management tools:

Options:
A.

Have a Mathematical Focus

B.

Facilitate Decision Making

C.

Require Automation

Questions 116

To measure the customer’s perception of the quality of a software system, what type of measure would you use?

Options:
A.

Objective

B.

Subjective

C.

Process Measure

D.

Process Variation

Questions 117

Which of the following is considered a metric?

Options:
A.

Lines of code

B.

Hours worked

C.

Pages of documentation

D.

Mean time to failure

E.

Number of staff assigned to a project

Questions 118

Tactical Planning answers the question:

Options:
A.

What to do?

B.

How to do it?

C.

What objectives need to be accomplished?

D.

How IT customers will be satisfied?

E.

How customer satisfaction will be exceeded?

Questions 119

Internal control systems have two components. The first is_____________ ,and the second is the __________ within an individual business application

Options:
A.

Environmental Controls, Transaction Processing Controls

B.

Transaction Processing Controls, Environmental Controls

C.

General Control, Environmental Control

D.

Environmental Control, General Control

Questions 120

A test case tested data values at 0, 9, 10, 11, 49, 50, 51, 100. Which black-box technique was most likely used to generate these data points.

Options:
A.

Error Guessing

B.

Boundary Analysis

C.

Equivalence Partitioning

D.

Data Sampling