Questions 61

There is a strong correlation between process maturity and defect rates. As the process maturity level increases, the defect rate decreases.

Options:
A.

True

B.

False

Questions 62

Requirements reviews, code walkthroughs, and inspections are examples of:

Options:
A.

Verification

B.

Validation

Questions 63

Three of the four interconnected project variables are: scope, resources, and schedule. What is the fourth variable?

Options:
A.

Requirements

B.

Budget

C.

Quality

D.

Function Points

E.

Constraints

Questions 64

Which of the following management philosophies would be associated with a quality management philosophy as opposed to the traditional management philosophy?

Options:
A.

Competition

B.

Focus on Detection

C.

Teamwork

D.

Controlling

E.

Fire Fighting

Questions 65

Special concerns during acceptance testing of software developed by a vendor are:

Options:
A.

Meets Specifications

B.

Adequate Test Data

C.

Preparation for Operation

D.

On Time

E.

All of the above

Questions 66

The following types of controls, which are designed to alert individuals to a process problem such as control totals assuring data transmissions are complete, are called:

Options:
A.

Preventive Controls

B.

Detective Controls

C.

Corrective Controls

D.

Quality Controls

E.

All of the above

Questions 67

One of the most effective arguments for establishing an independent test group within an IT organization is:

Options:
A.

Programmers cannot be trusted

B.

It is difficult for people to find their own errors

C.

Programmers cannot be trained to test

D.

Organizational auditors like independent testing

Questions 68

In the new quality management philosophy, the emphasis must be on:

Options:
A.

Defect Identification

B.

Quality Control

C.

Reducing Rework

D.

Catching Defects

Questions 69

Which of the following is / are level(s) for maturing the Deliverables Processes?

Options:
A.

Constraint Requirements

B.

Business Requirements

C.

Relational Requirements

D.

All of the above

Questions 70

Planning for system test process begins when:

Options:
A.

After coding phase

B.

At start of system testing phase

C.

At project start

D.

After design phase

Questions 71

In which company was the concept known as "Just in Time" first implemented?

Options:
A.

Toyota

B.

Motorola

C.

Honda

D.

Microsoft

Questions 72

Which of the following is considered a subjective measure?

Options:
A.

Lines of code

B.

Customer satisfaction

C.

Mean time to failure

D.

Hours to write a thousand lines of code

E.

Defect removal efficiency

Questions 73

Which organization developed the generally accepted model for internal control?

Options:
A.

AICPA

B.

COSO

C.

CobiT

D.

ERME ISO

Questions 74

The concept of "just in time", as pioneered by Toyota, is only applicable to inventory control.

Options:
A.

True

B.

False

Questions 75

Which of the following is NOT normally considered one of the questions that must be answered in performing quality planning?

Options:
A.

Where are we?

B.

Where do we want to go?

C.

How are we going to get there?

D.

When will it be done?