There is a strong correlation between process maturity and defect rates. As the process maturity level increases, the defect rate decreases.
Requirements reviews, code walkthroughs, and inspections are examples of:
Three of the four interconnected project variables are: scope, resources, and schedule. What is the fourth variable?
Which of the following management philosophies would be associated with a quality management philosophy as opposed to the traditional management philosophy?
Special concerns during acceptance testing of software developed by a vendor are:
The following types of controls, which are designed to alert individuals to a process problem such as control totals assuring data transmissions are complete, are called:
One of the most effective arguments for establishing an independent test group within an IT organization is:
In the new quality management philosophy, the emphasis must be on:
Which of the following is / are level(s) for maturing the Deliverables Processes?
Planning for system test process begins when:
In which company was the concept known as "Just in Time" first implemented?
Which of the following is considered a subjective measure?
Which organization developed the generally accepted model for internal control?
The concept of "just in time", as pioneered by Toyota, is only applicable to inventory control.
Which of the following is NOT normally considered one of the questions that must be answered in performing quality planning?
PDF + Testing Engine
|
---|
$57.75 |
Testing Engine
|
---|
$43.75 |
PDF (Q&A)
|
---|
$36.75 |
Software Certifications Free Exams |
---|
|