New Year Special 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bestdeal

ASQ CQE Exam Success: Certified Quality Engineer Complete Study and Preparation Tips

Questions 1

The holes in this drawing have what kind of tolerance?

CQE Question 1

The holes in this drawing have what kind of tolerance?

Options:
A.

Collateral

B.

Bilateral

C.

Unilateral

D.

Vertical

ASQ CQE Premium Access
Questions 2

A cause and effect diagram is also called which of the following?

Options:
A.

Pareto diagram.

B.

Fishbone diagram.

C.

Boxplot.

D.

Histogram.

Questions 3

In the failure rate model shown below, which one of the sections represents the period when catastrophic failures are likely to occur?

Options:
A.

A

B.

B

C.

C

D.

All sections can experience catastrophic failure.

Questions 4

When a 24 experiment is fractionated to a 24'5 experiment, the fractioned design is also known as a

Options:
A.

90% fraction

B.

75% fraction

C.

fraction

D.

fraction

Questions 5

What type of test should be used to detect certain kinds of subsurface flaws?

Options:
A.

Visual inspection

B.

Liquid penetrant

C.

Magnetic particle

D.

Rockwell

Questions 6

The design function which assigns probability of failures between components or subsystems is called

Options:
A.

Apportionment.

B.

Significance

C.

Confidence.

D.

Qualification.

Questions 7

Which of the following equations is used to calculate the upper control limit for an average chart?

Options:
A.

x-a2r

B.

x-a2 r

C.

X+ D4 R

D.

X-D-R

Questions 8

Which of the following tools is an example of a noncontact measurement tool?

Options:
A.

Laser scanner

B.

Hardness tester

C.

Micrometer

D.

Caliper

Questions 9

Which of the following tools can be used to evaluate the normality of a data set?

Options:
A.

Probability plot

B.

CUSUM chart

C.

Box and whisker chart

D.

Kruskal-Wallis rest

Questions 10

A company decides to adopt a total quality system and has started the process by developing quality policies. Rank in order, from first to last, the rest of the steps that need to be performed to implement this system.

1.Audit the system

2.Determine system requirements

3.Develop a measurement system

4.Perform continuous improvement activities

H Calculator

Options:
A.

2, 1,3.4

B.

2, 3, 1,4

C.

3, 2.4. 1

D.

3,4, 1,2

Exam Code: CQE
Certification Provider: ASQ
Exam Name: Certified Quality Engineer
Last Update: Jan 20, 2025
Questions: 175

ASQ Related Exams

How to pass ASQ CMQ-OE - Certified Manager of Quality/Organizational Excellence Exam Exam
How to pass ASQ CSQE - Certified Software Quality EngineerExam Exam

ASQ Free Exams

ASQ Free Exams
Boost your ASQ exam readiness with free materials and practice tests from Examstrack. Get started today at Examstrack.