As a commonly used problem solving technique, which of the following would be the BEST application of a Pareto chart?
Ⅰ. To determine when to make proactive adjustments to a process.
Ⅱ. To differentiate between major and minor problem areas.
Ⅲ. To gather data and to design experimental controlled changes.
Ⅳ. To evaluate the results of other problem solving techniques upon the product or service.
Quality planning is an activity that identifies the needs of which of the following stakeholders?
The following data sets were presented to top management.
Which problem area should be targeted for improvement first?
80° o of weekly inspection non-conforming reports presented to the material review board (MRB) at Marathon Manufacturing Co. end up not being dispositioned for corrective action. Project management developed a risk management plan which included a standard repair manual (SRM) to help mitigate these issues. Only conditions that exceed SRM requirements or specifications will now be forwarded for MRB review. A week after releasing the SRM. the quality engineering team decided to generate and distribute weekly alert reports of non-conformities that exceed SRM requirements or specifications to all inspectors. They also instructed all employees involved in the creation of those discrepancies be re-trained.
Which of the following processes may be considered a risk treatment?
A system was designed with 3 capacitors. When the system is first activated all capacitors are operating. The system continues to operate as long as at least 1 capacitor is operating. This is an example of
Which of the following types of "voice" is most effective in written communication?
If a quality engineer discovers a situation in which unlabeled finished product could be shipped to customers, what would be an appropriate preventive action to take?