ASQ CQE Exam Success: Certified Quality Engineer Complete Study and Preparation Tips

Questions 31

As a commonly used problem solving technique, which of the following would be the BEST application of a Pareto chart?

Ⅰ. To determine when to make proactive adjustments to a process.

Ⅱ. To differentiate between major and minor problem areas.

Ⅲ. To gather data and to design experimental controlled changes.

Ⅳ. To evaluate the results of other problem solving techniques upon the product or service.

Options:

A.

I and II only

B.

II and III only

C.

II and IV only

D.

I, II, III and IV

Buy Now
Questions 32

Quality planning is an activity that identifies the needs of which of the following stakeholders?

Options:

A.

Management

B.

Suppliers

C.

Employees

D.

Customers

Buy Now
Questions 33

Working on ail design phases simultaneously is characteristic of

Options:

A.

design for six sigma

B.

design for reliability

C.

quality function deployment

D.

concurrent engineering

Buy Now
Questions 34

The following data sets were presented to top management.

CQE Question 34

Which problem area should be targeted for improvement first?

Options:

A.

A

B.

B

C.

C

D.

D

Buy Now
Questions 35

In a value stream analysis, inspection is typically classified as

Options:

A.

real value added

B.

organizational value added

C.

non-value added

D.

customer value added

Buy Now
Questions 36

80° o of weekly inspection non-conforming reports presented to the material review board (MRB) at Marathon Manufacturing Co. end up not being dispositioned for corrective action. Project management developed a risk management plan which included a standard repair manual (SRM) to help mitigate these issues. Only conditions that exceed SRM requirements or specifications will now be forwarded for MRB review. A week after releasing the SRM. the quality engineering team decided to generate and distribute weekly alert reports of non-conformities that exceed SRM requirements or specifications to all inspectors. They also instructed all employees involved in the creation of those discrepancies be re-trained.

Which of the following processes may be considered a risk treatment?

Options:

A.

Generating a weekly report of non-conformities that exceed SRM requirement and specifications

B.

Distributing weekly alert report of non-conformities to all inspectors

C.

Instructing that all employees involved creating those discrepancies be re-trained

D.

Reducing throughput at Marathon Manufacturing Co.

Buy Now
Questions 37

The primary characteristic of risk management is being

Options:

A.

simple

B.

reactive

C.

unnatural

D.

all-inclusive

Buy Now
Questions 38

A system was designed with 3 capacitors. When the system is first activated all capacitors are operating. The system continues to operate as long as at least 1 capacitor is operating. This is an example of

Options:

A.

Redundancy.

B.

A series system.

C.

An active parallel system.

D.

A standby parallel system.

Buy Now
Questions 39

Which of the following types of "voice" is most effective in written communication?

Options:

A.

Active

B.

Passive

C.

Strong

D.

Soft

Buy Now
Questions 40

If a quality engineer discovers a situation in which unlabeled finished product could be shipped to customers, what would be an appropriate preventive action to take?

Options:

A.

Train the shipping department staff in quality tools and techniques

B.

Identify the unlabeled product and have it labeled

C.

Form a team to error-proof the process

D.

Conduct a backward trace of the process

Buy Now
Exam Code: CQE
Exam Name: Certified Quality Engineer
Last Update: Dec 9, 2024
Questions: 175

PDF + Testing Engine

$164.99
$57.75

Testing Engine

$124.99
$43.75

PDF (Q&A)

$104.99
$36.75