Questions 21

Which of the following criteria must be considered when a classification of defects system is established?

Options:

A.

The current cost of quality system

B.

The financial impact of the defects

C.

Tightness of tolerance as an indication of failure

D.

The relative seriousness of the defects

Buy Now
Questions 22

The following is an incomplete ANOVA table.

SourcessdfMSF

Treatment3334

Error20

Total64324

What is the value of the F-statistic used to test for differences in treatment?

Options:

A.

0.21

B.

1.07

C.

2.87

D.

5.37

Buy Now
Questions 23

Which of the following tools should be used to break a broad goal into increasingly detailed levels?

Options:

A.

Affinity diagram

B.

Interrelationship digraph

C.

Matrix diagram

D.

Tree diagram

Buy Now
Questions 24

The pre-production or pre-service planning process should include which of the following activities?

Options:

A.

Preparation of product and process control plans

B.

Implementation of process quality audits

C.

Development of cost of quality parameters

D.

Certification of suppliers

Buy Now
Questions 25

When requesting "worst case" design analysis, you expect the reliability group to

Options:

A.

Analyze the worst rejects.

B.

Analyze only those products failing to meet specification requirements.

C.

Determine whether product requirements can be met with subassemblies assumed at their worst combination of tolerances.

D.

Assume all subassembly tolerances at their maximum limit.

Buy Now
Questions 26

A test-retest study is performed to a coordinate measuring machine (CMM) using a working standard of 100.00 ± 0.001 mm (95% confidence). The length of the standard is measured 30 rimes. The mean and standard deviation of the measurements are x = 107.883 mm and 5 = 2.497 mm. All of the measurements are made are the same location on the standard and are taken by the same technician, who mounts and dismounts the unit for each measurement.

The precision of the CMM is estimated to be

Options:

A.

0.456

B.

2.497

C.

7.833

D.

12.735

Buy Now
Questions 27

In a sample of 2.000 items taken from a large lot. 80 are found to be nonconforming. What is the 95% confidence interval for the proportion of nonconforming items?

Options:

A.

[0.0328. 0.0472]

B.

[0.0314. 0.0486]

C.

[0.0308. 0.0499]

D.

[0.0302. 0.049

Buy Now
Questions 28

Which of the following assumptions is a robustness factor suitable for validating statistical conclusions?

Options:

A.

Low reliability of measures

B.

High statistical power

C.

Low reliability of treatment

D.

Violated expectations of test

Buy Now
Questions 29

An inventory list of laptops in a sales office is an example of which measurement scale?

Options:

A.

Nominal

B.

Ordinal

C.

Interval

D.

Ratio

Buy Now
Questions 30

The best reason to record and distribute meeting minutes is to

Options:

A.

capture any decisions made

B.

track the attendance of participants

C.

create an agenda for the next meeting

D.

create a record of the rime, place, and duration of the meeting

Buy Now
Exam Code: CQE
Exam Name: Certified Quality Engineer
Last Update: Jul 16, 2024
Questions: 175

PDF + Testing Engine

$159.99
$56

Testing Engine

$119.99
$42

PDF (Q&A)

$99.99
$35