Summer Special 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bestdeal

Ace the GAQM CLSSBB Exam: Ultimate Preparation Guide

Questions 51

P(A) = .42, P(B) = .58, P(A&B) = .10. Find P(A or B).

Options:

A.

.90

B.

1.00

C.

.24

D.

none of the above

Buy Now
Questions 52

A population of size 1,000,000 has mean 42 and standard deviation 6. Sixty random samples, each of size 15 are selected. According to the Central Limit Theorem the distribution of the sixty sample means has a mean of approximately:

Options:

A.

42

B.

42/6

C.

42/15

D.

42/ 15

E.

none of the above

Buy Now
Questions 53

A population is bimodal with a variance of 5.77. One hundred samples of size 30 are randomly collected and the 100 sample means are calculated. The standard deviation of these sample means is approximately:

Options:

A.

5.77

B.

2.40

C.

1.05

D.

0.44

E.

0.19

Buy Now
Questions 54

Find the value of (8) in the ANOVA table. Assume:

CLSSBB Question 54

Options:

A.

16.4

B.

3.2

C.

18.6

D.

23.2

E.

4.54

F.

12.2

G.

0.525

Buy Now
Questions 55

A control chart is to be used to display the number of non-conducting diodes. Each point on the chart represents the number of bad diodes in a box of 1000. The appropriate control chart to use is:

Options:

A.

x-bar and R

B.

median

C.

individual and moving range

D.

p

E.

np

F.

u

G.

c

Buy Now
Questions 56

This experimental design is:

Options:

A.

full factorial

B.

half factorial

C.

quarter factorial

D.

none of the above

Buy Now
Questions 57

A black belt is developing a failure mode and effects analysis (FMEA) for the hamburger preparation station in a fast-food restaurant. The following ratings were developed for the low-heat temperature failure mode.

Severity = 9

Occurrence = 2

Detection = 1

What is the risk priority number (RPN) for this FMEA?

Options:

A.

4

B.

6

C.

12

D.

18

Buy Now
Questions 58

When a team consists of five black belts and eight quality engineers, how many unique meetings could be held consisting of one black belt and two quality engineers?

Options:

A.

40

B.

80

C.

140

D.

280

Buy Now
Questions 59

A Black Belt is going to monitor the number of defects on different size samples. Which of the following control charts would be most appropriate?

Options:

A.

u

B.

np

C.

c

D.

p

Buy Now
Questions 60

Find the value of (11) in the ANOVA table. Assume:

CLSSBB Question 60

Options:

A.

Choices Not available (but this Question Answer E)

Buy Now
Exam Code: CLSSBB
Exam Name: Certified Lean Six Sigma Black Belt (CLSSBB)
Last Update: Sep 18, 2024
Questions: 357

PDF + Testing Engine

$159.99
$64

Testing Engine

$119.99
$48

PDF (Q&A)

$99.99
$40