Ace the GAQM CLSSBB Exam: Ultimate Preparation Guide

Questions 41

Find the value of (4) in the ANOVA table. Assume:

CLSSBB Question 41

Options:

A.

16.4

B.

3.2

C.

18.6

D.

23.2

E.

4.54

F.

12.2

G.

0.525

Buy Now
Questions 42

The quality leader most associated with the concept of robustness:

Options:

A.

Juran

B.

Ishikawa

C.

Crosby

D.

Feigenbaum

E.

Taguchi

F.

none of the above

Buy Now
Questions 43

A higher resolution number for an experimental design indicates that:

Options:

A.

results are more clear

B.

confounding between main effects and interaction effects are less likely to be significant

C.

a higher number of replications have been used

D.

all factors have been tested at all levels

E.

the design is more balanced

Buy Now
Questions 44

Causes in a cause and effect diagram often include management, measurement systems, mother nature and the four standard causes:

Options:

A.

man, material, methods, machines

B.

man, manufacturing, methods, material

C.

marketing, methods, material, machines

D.

man, material, millennium, machines

E.

none of the above

Buy Now
Questions 45

There are 14 different defects that can occur on a completed time card. The payroll department collects 328 cards and finds a total of 87 defects. DPMO =:

Options:

A.

87 ÷ 328

B.

87 ÷ (328 × 14)

C.

14 ÷ 87

D.

87 ÷ 14 × 1,000,000

E.

328 ÷ 87

F.

87 × 1,000,000 ÷ (14 × 328)

Buy Now
Questions 46

In a series of linked processes and associated feedback loops the product or service flows ________ and the information flows ________.

Options:

A.

rapidly, slower

B.

downstream, upstream

C.

evenly, digitally

D.

sooner, later

E.

to the customer, from the supplier

F.

none of the above

Buy Now
Questions 47

A pharmaceutical manufacturer is designing an experiment to test four different capsule ingredients designed to reduce dissolution time. Each ingredient will be tested at 10 milligrams and 40 milligrams. A full factorial design is used with five replications per run. The number of levels, factors and runs is, respectively:

Options:

A.

2, 4, 16

B.

4, 5, 8

C.

10, 4, 40

D.

2, 20, 16

Buy Now
Questions 48

A project activity not on the critical path has required 20% longer than the time originally allocated. The project team should:

Options:

A.

inform all concerned that the entire project will be delayed by 20%

B.

inform all concerned that the entire project will be delayed but by less than 20%

C.

study the effect this will have on other activities because the project may still be on schedule

Buy Now
Questions 49

Find the value of (3) in the ANOVA table. Assume:

CLSSBB Question 49

Options:

A.

16.4

B.

3.2

C.

18.6

D.

23.2

E.

4.54

F.

12.2

G.

0.525

Buy Now
Questions 50

A team studies a coil steel banding process and makes five changes resulting in productivity improvements of 2%, 2.8%, 2.4%, 2% and 3% respectively. These improvements are best described by which approach to problem solving?

Options:

A.

5S

B.

Poka yoke

C.

Kaizen

D.

PDCA

E.

Re-engineering

Buy Now
Exam Code: CLSSBB
Exam Name: Certified Lean Six Sigma Black Belt (CLSSBB)
Last Update: Dec 13, 2024
Questions: 357

PDF + Testing Engine

$164.99
$66

Testing Engine

$124.99
$50

PDF (Q&A)

$104.99
$42