Causes in a cause and effect diagram often include management, measurement systems, mother nature and the four standard causes:
There are 14 different defects that can occur on a completed time card. The payroll department collects 328 cards and finds a total of 87 defects. DPMO =:
In a series of linked processes and associated feedback loops the product or service flows ________ and the information flows ________.
A pharmaceutical manufacturer is designing an experiment to test four different capsule ingredients designed to reduce dissolution time. Each ingredient will be tested at 10 milligrams and 40 milligrams. A full factorial design is used with five replications per run. The number of levels, factors and runs is, respectively:
A project activity not on the critical path has required 20% longer than the time originally allocated. The project team should:
A team studies a coil steel banding process and makes five changes resulting in productivity improvements of 2%, 2.8%, 2.4%, 2% and 3% respectively. These improvements are best described by which approach to problem solving?
PDF + Testing Engine |
---|
$66 |
Testing Engine |
---|
$50 |
PDF (Q&A) |
---|
$42 |
GAQM Free Exams |
---|
|