If the probability and consequence combination (risk) is high enough to be unacceptable, then
When in accurate or insufficient failure data exists on the specific equipment item for quantative probability of failure analysis then
When the inspection program is optimized based on an understanding of risk, one or more of the following cost reduction benefits may be realized. Except one
Coordinated activities to direct and control an organization with regard to risk.
The following assumption can bemade that significantly impactthe calculated corrosion rate early in the equipment life
PDF + Testing Engine |
---|
$57.75 |
Testing Engine |
---|
$43.75 |
PDF (Q&A) |
---|
$36.75 |
API Free Exams |
---|
|