Which of the following statements is true regarding the automation of Java applications? (Choose two.)
Which of the following does the Blue Prism Login Agent functionality support? (Choose three.)
Which of the following statements about Blue Prism Web Service parameters are correct? (Choose two.)
Which of the following are valid options to circumvent the risk that lower priority work may never be worked if a process is configured to prioritise work in a Blue Prism Work Queue in an order other than the default priority (first in first out)?
1. Ensure that there are always enough robots working the process to clear all work each day
2. Design a solution that uses more than one method of prioritising, adding logic to your design that works lower priority items if they are over a configured age.
3. Ensure all Business Objects used in the solution are configured to have a run mode of Background
4. Include SLA monitoring and alerting to your solution, to ensure Blue Prism Controllers are informed if work items are at a risk of missing their SLAs.
Which of the following statements, about interfacing with browser applications are true? (Choose three.)
A Process Definition Document, for a new process to open ISA accounts, specifies that the value “2008 Cash ISA” is to be entered into the Product Selection field of the following screen:
The Product Selection field is a drop down menu with the following options available:
According to Best Practice, which of the following design options are correct for populating the Product Selection field with the value 2008 Cash ISA:
A retail bank has promoted 5 Blue Prism processes to production:
Email Poller
Customer Onboarding
Amend Contact Details
Direct Debit Cancellations
Onboarding Reporting
One instance of the email Poller process will run 24/7 feeding work queues for the other two processes.
Two concurrent instances of the Customer Onboarding process will run between 6am and 11pm each day on the same VM.
Two concurrent instances of the Amend Contact Details process will run between 8am and 8pm each day on two VMs.
One instance of the Direct Debit Cancellations process will run between 6am and 4pm each day on the same VM as the Email Poller process. The scheduler that starts the Direct Debit Cancellations process is configured to run the Onboarding Reporting process when the Direct Debit Cancellations process has successfully completed.
How many robot licenses are required?
Study the process flow below:
The initial values for the Loop Count and Max Loop data items are 0 and 5 respectively.
How many times will the Process ‘Open Account Part 1’ be read into memory during the execution of the Process?
Which of the following techniques is most suitable for extracting text from a PDF Document which is a scan of a hand written document?
PDF + Testing Engine |
---|
$57.75 |
Testing Engine |
---|
$43.75 |
PDF (Q&A) |
---|
$36.75 |
Blue Prism Free Exams |
---|
|