Which of the following stages can be found in BOTH the Object Studio and the Process Studio'' Select the TWO correct responses.
A)
B)
C)
D)
E)
Please refer to the exhibit.
Here's one of the Actions in a Business Object that is used to place orders in an application.
What best practice for Object Design is NOT followed in this Action page?
Please refer to the exhibits.
How many Full Time Employees will the generated Report include?
Examine the following Process flow:
The ‘Loop Customer List’ loop is configured to loop through the ‘Customer List’ Collection.
Any Exceptions Encountered on the ‘Email Customers’ sub-page will be resolved in the same page.
How many times will the ‘Email Customer’ sub-page be executed?
Blue Prism Enterprise is shipped with Visual Business Objects (VBO) However these need to be imported into the Environment Where can these VBOs be found?
Please refer to the exhibits
Under what TWO conditions will the process move to the 'Close Down' page directly from the Stop? Decision stage during runtime?
In which of these scenarios is it ok not to use a Blue Prism work queue as part of your Blue Prism solution?
There are multiple rows of conditions in the Properties window of the Wait Stage. Which of the following is TRUE?
Study the following Process flow:
The Process flow is intended to test the value of the Input data item to determine if it falls within a range of numbers, and then assign a value as an output. The number ranges are defined as between 1 to 100, between 101 to 200, and anything outside these ranges.
The Calculation stages will set the value of the Result data item to 1, 2 or 3.
To enable the Process flow to work correctly, what is the correct expression for the Choice stage branch named ‘Between 1 and 100’?
PDF + Testing Engine |
---|
$66 |
Testing Engine |
---|
$50 |
PDF (Q&A) |
---|
$42 |
Blue Prism Free Exams |
---|
|