Black Friday Special 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bestdeal

Master the Blue Prism AD01 Exam: Essential Study Tips and Strategies

Questions 31

What is NOT considered one of the golden rules for Object Design?

Options:

A.

Keep actions small and limited to a specific task

B.

Do not include business logic in the Object

C.

Use InpuVOutput parameters to promote usability

D.

Use a single Object for an entire application

Buy Now
Questions 32

Which of the following stages can be found in BOTH the Object Studio and the Process Studio'' Select the TWO correct responses.

A)

AD01 Question 32

B)

AD01 Question 32

C)

AD01 Question 32

D)

AD01 Question 32

E)

AD01 Question 32

Options:

A.

Option A

B.

Option B

C.

Option C

D.

Option D

E.

Option E

Buy Now
Questions 33

Please refer to the exhibit.

AD01 Question 33

Here's one of the Actions in a Business Object that is used to place orders in an application.

What best practice for Object Design is NOT followed in this Action page?

Options:

A.

Use a conditional Wait stage to confirm the screen change

B.

The timeout of the Wart stage should lead to a System Exception

C.

An action page should first confirm if the application is connected

D.

Avoid applying business rules and decision-making logic in an Action

Buy Now
Questions 34

Please refer to the exhibits.

AD01 Question 34

AD01 Question 34

AD01 Question 34

How many Full Time Employees will the generated Report include?

Options:

A.

2

B.

0

C.

4

D.

1

Buy Now
Questions 35

Examine the following Process flow:

AD01 Question 35

The ‘Loop Customer List’ loop is configured to loop through the ‘Customer List’ Collection.

Any Exceptions Encountered on the ‘Email Customers’ sub-page will be resolved in the same page.

How many times will the ‘Email Customer’ sub-page be executed?

Options:

A.

It's impossible to say without viewing the 'Email Customer' sub-page

B.

The loop will be infinite

C.

0

D.

25

E.

1

Buy Now
Questions 36

Blue Prism Enterprise is shipped with Visual Business Objects (VBO) However these need to be imported into the Environment Where can these VBOs be found?

Options:

A.

[Root Directory] \BluePrism\VBO\lnstall'.

B.

[Root Directory] \Blue Pnsm Training'*

C.

[Root Directory] AProgram Files\Blue Prism Limited\Blue Prism Automate\VBO\

D.

[Root Directory] AProgram Files\Blue Prism Limited\

Buy Now
Questions 37

Please refer to the exhibits

AD01 Question 37

AD01 Question 37

Under what TWO conditions will the process move to the 'Close Down' page directly from the Stop? Decision stage during runtime?

Options:

A.

The specified Stop time has passed

B.

'Request Stop received from Control Room

C.

Priority of the remaining Queue Items is 0

D.

All the Queue Items have been processed

E.

Immediate Stop' received from Control Room

Buy Now
Questions 38

In which of these scenarios is it ok not to use a Blue Prism work queue as part of your Blue Prism solution?

Options:

A.

A Blue Prism work queue is not required for simple linear processes that do not work multiple cases.

B.

A Blue Prism work queue should always be used. It eliminates the risk of contention and allows you to gracefully pause the queue at any time.

C.

A Blue Prism work queue is not required if the business process interfaces with a Work List system with in-built capability to ensure multiple users cannot work the same case at the same time

D.

A Blue Prism Work Queue decreases the scalability of the solution and therefore should only be used for complex scenarios such as multi-day processing.

Buy Now
Questions 39

There are multiple rows of conditions in the Properties window of the Wait Stage. Which of the following is TRUE?

Options:

A.

The Wait Stage will sequentially check each condition, it does not require all conditions to be met

B.

If all conditions are met before the TimeOut penrid expires, the process will continue

C.

If no conditions are met, an internal error will appear and terminate the process

D.

The Wait Stage will simultaneously check all conditions and follow the logic of whichever condition is met first

Buy Now
Questions 40

Study the following Process flow:

AD01 Question 40

The Process flow is intended to test the value of the Input data item to determine if it falls within a range of numbers, and then assign a value as an output. The number ranges are defined as between 1 to 100, between 101 to 200, and anything outside these ranges.

The Calculation stages will set the value of the Result data item to 1, 2 or 3.

To enable the Process flow to work correctly, what is the correct expression for the Choice stage branch named ‘Between 1 and 100’?

Options:

A.

[Input] >= 1 AND [Input] <= 100

B.

[Input] >= 1 AND <= 100

C.

[Input] >= ‘1’ AND [Input] <= ‘100’

D.

[Input] >= 1 [Input] < 100

E.

[Input] BETWEEN 1 AND 100

Buy Now