Examine the following Process flow:
The ‘Customer Credits’ Collection contains the following data:
The ‘Customer Account Credits’ loop is configured to loop through the ‘Customer Credits’ Collection.
The ‘Total Credits’ data item is configured as a number data item with an initial value of 0.
The ‘Get Total Credits’ Calculation stage contains the following expression:
What will the Total Credit data item value be after the page has executed?
The Developer is deploying a Process into a Production environment. Which best practice option would you recommend for the Stage Logging of a Decision stage on the Main Page?
A process is currently scheduled to run every day but needs to be temporarily stopped for 3 months According to best practice, how should this be done?
FILL BLANK
Examine the following Blue Prism Process diagram:
The Process contains logic in the ‘Control Room Stop Request?’ Decision stage, to recognise when a Process Controller has used the ‘Request Stop’ feature in Control Room, to bring the Process to a controlled stop.
What expression would you use in the ‘Control Room Stop Request?’ Decision stage, to ensure that the Process recognises that the Control Room ‘Request Stop’ command has been triggered?
(Remember, Blue Prism expressions are case sensitive)
Study the following image showing pan: of the flow within a process:
What problems do you see with the process flow? (select 2 responses)
Which ONE of the following Stages can only be found in the Process Studio?
A)
B)
C)
D)
Which of the following Blue Prism stages can be found in both Process Studio and Object Studio? (Select ail items which apply)
A)
B)
C)
D)
E)
F)
When automating a Windows application, what type of stage is used to perform a 'Global Send Key Events' action?
What is the maximum number of Start stages that a Process sub-page can contain?
PDF + Testing Engine |
---|
$66 |
Testing Engine |
---|
$50 |
PDF (Q&A) |
---|
$42 |
Blue Prism Free Exams |
---|
|