Weekend Special 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: sale65best

Get Certified: Proven Methods to Pass the Brocade 150-820 Exam

Questions 51

A principal RBridge fails.

What happens to the VCS virtual IP address?

Options:

A.

The newly elected principal switch's management IP becomes the VCS virtual IP address.

B.

The switch with the highest WWN owns the VCS virtual IP address.

C.

The switch with the lowest MAC management IP address becomes the VCS virtual IP address.

D.

The existing VCS virtual IP address will be bound to the newly elected principal switch.

Buy Now
Questions 52

You want to remove one of your Brocade VDX 6740s from your VCS fabric in Logical Chassis mode. You issue the no vcs enable command on the VDX 6740 but the switch is not removed.

What would you do to resolve the problem?

Options:

A.

Issue the no vcs logical-chassis enable command on the VDX 6740.

B.

Change the existing VCS ID of the VDX 6740.

C.

Issue the vcs replace rbridge-id command on the principal switch.

D.

Remove the physical connections to the logical chassis cluster on the VDX 6740.

Buy Now
Questions 53

You connected interface 2 on a Brocade VDX 6740 to your LAN, but no traffic is traversing the link.

SW1# show interface tengigabitethernet 1/0/2

TenGigabitEthernet 1/0/2 is up, line protocol is down (link protocol down)

Hardware is Ethernet, address is 0027.f8b2.d728

Current address is 0027.f8b2.d728

Pluggable media present

Receive Statistics:

0 packets, 0 bytes

Unicasts: 0, Multicasts: 0, Broadcasts: 0

64-byte pkts: 0, Over 64-byte pkts: 0, Over 127-byte pkts: 0

Over 255-byte pkts: 0, Over 511-byte pkts: 0, Over 1023-byte pkts: 0

Over 1518-byte pkts(Jumbo): 0

Runts: 0, Jabbers: 0, CRC: 0, Overruns: 0

Errors: 0, Discards: 0

Transmit Statistics:

0 packets, 0 bytes

Unicasts: 0, Multicasts: 0, Broadcasts: 0

Underruns: 0

Errors: 0, Discards: 0

Referring to the exhibit, what is happening?

Options:

A.

The interface is shutdown.

B.

The SFP is faulty.

C.

The cable is faulty.

D.

The protocol is administratively down.

Buy Now
Questions 54

Your Brocade VCS Fabric design will include vLAG connectivity to devices in your data center.

Which three statements are true? (Choose three.)

Options:

A.

Hosts with teamed NICs need to have two or more links connected to two or more VDX switches in the fabric.

B.

ESX hosts will automatically form vLAGs when vCenter integration is enabled.

C.

Pairs of core routers running a multi-chassis trunking protocol need to have at least one link each connected to two or more VDX switches in the fabric.

D.

Stand-alone core routers need to have one link, each connected to a different VDX switch in the fabric.

E.

Third-party Ethernet switches need to have two or more links connected to two or more VDX switches in the fabric.

Buy Now
Exam Code: 150-820
Exam Name: Brocade Certified Ethernet Fabric Professional 2015
Last Update: Dec 9, 2024
Questions: 182

PDF + Testing Engine

$164.99
$57.75

Testing Engine

$124.99
$43.75

PDF (Q&A)

$104.99
$36.75