At the time of preparing construction documents, the client is undecided about replacing flooring within the scope of work. How would the designer obtain pricing for including the flooring?
Earthquakes and the loads caused by winds are examples of
A designer has been hired to design millwork for a school library. During installation, there is a conflict between existing field conditions and shop drawing dimensions. Who is responsible for the discrepancy?
A designer is working on a joint venture project with a local engineering firm for a large university project. What drawing system will BEST incorporate coordination of project information?
With regard to electrical systems, one responsibility of an interior designer is to provide the
Permit application requirements are developed by the
A designer has a contract with a client to provide complete contract documents for a tenant build-out. Specifying FF&E is beyond the scope of the contract. The designer makes some general FF&E recommendations to show a systems furniture layout as required by the local code officials. The furniture comes in over the client’s previously undisclosed budget. What should the designer do?
Administration, marketing, and management expenses in a design firm are examples of
What is the rentable square footage [m²] of a building?
Upon review of all consultants’ drawings, the designer notices that the placement of a water closet is not consistent with the contract documents. What should the designer do?