Allowances are included in contract documents when

Options:
A.

the project is design-build

B.

final product selection is unknown

C.

more competitive bidding is desired

D.

a proprietary specification is provided

CIDQ IDPX Premium Access
Questions 22

Upon completion of a project, what documents would the designer retain for their files?

Options:
A.

Record (as-built) drawings and specifications

B.

Post-occupancy evaluation and specifications

C.

Record (as-built) drawings and inspection report

D.

Post-occupancy evaluation and inspection report

Questions 23

The ground floor of a building contains a mixed occupancy with a retail store (9,500 sf [884 m²]) with an adjacent storage space (2,000 sf [186 m²]), a daycare (5,000 sf [465 m²]), and an office (6,000 sf [557 m²]). Based on the chart below, what is the occupant load for this floor?

Occupancy Type

Occupant Load Factor (sf/person)

Retail (Mercantile)

60

Storage

300

Daycare

35

Office (Business)

150

IDPX Question 23

Options:
A.

305

B.

368

C.

524

D.

527

Questions 24

A client wants to convert a 10,000 sf [929 m²] retail facility into an office space. What is the MOST important activity to do as a part of programming?

Options:
A.

Identify building codes

B.

Prepare record (as-built) drawings

C.

Calculate the number of parking spaces

D.

Determine which consultants are required

Questions 25

A contractor defaults on payments to a mechanical subcontractor. The subcontractor is protected and guaranteed payment by a

Options:
A.

payment bond

B.

mechanic’s lien

C.

performance bond

D.

builder’s risk insurance

Questions 26

In order for a building permit to be issued, what MUST be completed?

Options:
A.

demolition phase of project

B.

submission of contract documents

C.

final inspection by a building official

D.

issuance of the certificate of occupancy

Questions 27

What floor finish would BEST support a passive solar design strategy in a hot arid climate?

Options:
A.

vinyl

B.

wood

C.

carpet

D.

concrete

Questions 28

Which of the following is part of an active system for fire protection?

Options:
A.

Area of refuge

B.

Means of egress

C.

Protected stairwells

D.

Pre-action sprinklers

Questions 29

In a project that includes a home renovation and procurement of new furniture, what is the BEST fee structure?

Options:
A.

Hourly fee method and cost-plus method

B.

Square foot method and fixed fee method

C.

Fixed fee method and square foot method

D.

Value-oriented method and hourly fee method

Questions 30

What is the PRIMARY reason to maintain a master submittal log on a project?

Options:
A.

Confirm adherence to the contract

B.

Document the installation schedule

C.

Verify compliance with specifications

D.

Facilitate distribution and timely review