Free CIDQ IDPX Practice Exam with Questions & Answers | Set: 2

Questions 11

A corporate client tells their designer that they will be purchasing all of their ancillary furniture directly, and would only like the designer’s assistance with the remaining pieces. Which of the following would be in the designer’s scope to specify?

Options:
A.

Reception sofa

B.

Break room barstools

C.

Open office workstations

CIDQ IDPX Premium Access
Questions 12

A contractor has notified the designer that the existing paint in a space tests positive for lead. What is the correct course of action?

Options:
A.

The lead paint should be encapsulated with oil-based paint

B.

The designer should notify the Environmental Protection Agency (EPA)

C.

A professional licensed contractor should perform lead-paint abatement

D.

A custodian should vacuum with a high-efficiency particulate air (HEPA) filter vacuum

Questions 13

While on site, the designer notices that the glazing subcontractor is installing the storefront system in the wrong finish. What should the designer do?

Options:
A.

Report the discrepancy in a memo to the contractor and client

B.

Reach out to the glazing supplier to find out which finish was ordered

C.

Explain the issue at the next owner, architect, contractor (OAC) meeting

D.

Tell the subcontractor to stop their work and explain the issue to the contractor

Questions 14

A residential client wants to build an addition that would occupy the entire side-yard. What is the interior designer responsible for checking before proceeding?

Options:
A.

soils report

B.

access route

C.

setback requirement

D.

neighborhood agreement

Questions 15

Changes made to the contract documents during the bid (tender) process are documented in a(n)

Options:
A.

Bulletin

B.

Addendum

C.

Change order

Questions 16

After completion of a project, the client spills coffee on their new lobby sofa. Where would the client look for information on how to remove the stain?

Options:
A.

product data sheet

B.

warranty information

C.

maintenance manual

D.

furniture specification

Questions 17

What should be addressed FIRST in a letter of agreement?

Options:
A.

Legal obligations

B.

Scope of services

C.

Amount of retainer

D.

General bid conditions

Questions 18

Which person is MOST responsible for ensuring that the construction drawings are code-compliant?

Options:
A.

Developer

B.

Building owner

C.

Interior designer

D.

Building inspector

Questions 19

What should be evaluated by the design team in advance of a project kickoff with clients and stakeholders?

Options:
A.

Cost analysis and value engineering

B.

Site availability and schedule impacts

C.

System performance and subcontractor availability

Questions 20

What is the MINIMUM illumination level at the walking surface for a means of egress?

Options:
A.

1 footcandle [10.76 lux]

B.

2 footcandles [21.53 lux]

C.

5 footcandles [53.82 lux]

D.

9 footcandles [96.88 lux]

Exam Code: IDPX
Certification Provider: CIDQ
Exam Name: Interior Design Professional Exam
Last Update: Jul 11, 2025
Questions: 175