Free CIDQ IDPX Practice Exam with Questions & Answers

Questions 1

What rating is used to determine a material’s sound absorption?

Options:
A.

CAC

B.

STC

C.

NRC

D.

UL (CSA)

CIDQ IDPX Premium Access
Questions 2

What are the three parts of a Construction Specification Institute (CSI) specification?

Options:
A.

general, products, execution

B.

allowance, alternate, application

C.

information, purchasing, installing

D.

requirements, finishes, construction

Questions 3

Which of the following documents provides the design restrictions for window treatments in a new office fit-out?

Options:
A.

Tenant manual

B.

Local building codes

C.

Maintenance manual

D.

Manufacturer’s specifications

Questions 4

The purpose of shop drawings is to

Options:
A.

Analyze the fabrication method

B.

Approve completeness of the details

C.

Check conformance with the design intent

Questions 5

Several employees in an office suffer from pollen allergies. How could their symptoms be reduced while at work?

Options:
A.

Install non-operable windows

B.

Install high-efficiency air filters

C.

Utilize a passive ventilation system

D.

Relocate these employees to internal offices

Questions 6

Who conducts post-occupancy evaluation interviews?

Options:
A.

Building owner

B.

General contractor

C.

Design professional

D.

Furniture manufacturer

Questions 7

A post-occupancy evaluation indicates that occupants are cold during winter months due to the building’s HVAC system not performing according to design. What would have prevented this situation?

Options:
A.

commissioning

B.

additional diffusers

C.

a punch (deficiency) list

D.

an underfloor distribution system

Questions 8

The office manager for a client signed a contract for design services. However, the owner refuses to pay the design fee because the office manager did not have the authority to sign the contract. This is an issue of

Options:
A.

mutual assent

B.

breach of contract

C.

contractual capacity

D.

designer responsible disclaimer

Questions 9

During construction, a designer has been informed that the floor tile specified will delay occupancy. What is the BEST course of action?

Options:
A.

Modify the specifications to an alternate flooring type that is in stock

B.

Change the specifications to an in-stock tile and obtain the client’s agreement

C.

Notify the client and all subtrades that the anticipated schedule will be delayed

D.

Give an estimate of how far behind schedule the project is, with a new completion date

Questions 10

When estimating the total FF&E costs for installation, maintenance, and replacement, which of the following is being completed?

Options:
A.

Actual costs

B.

Planned value

C.

Life-cycle costing

D.

Cost-benefit analysis